BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item/Task Document Reference Precon. Const. Specified Cost of Negotiated Const. Owner <br /> Services Cost Manager's General Work/MACC Support Manager's <br /> Fee Conditions Services Contingency <br /> In order to assist the GC/CM proposers in developing the cost associated with the segments of the fee proposals process and how costs are intended to be treated under the Contract Documents,the Owner is providing the <br /> following Cost Responsibility Matrix(CRM).The shaded and checked box indicates in what section the Owner expects the GC/CM proposer to apply the identified costs.This list is not Intended to be a complete list of activities and <br /> costs required to complete the project,but a guide outline.Proposers should refer to the Request for Final Proposals(RFFP)along with the Contract Documents(Agreement&General Conditions),including all addenda,to <br /> ascertain all of the full project scope requirements.In the event there is conflict or omitted Items contained in the CRM,the Contract Documents shall govern.Note that there are some items listed in the CRM that are not <br /> specifically addressed in the RFFP or Contract Documents but have been added to this CRM to clarify scope.These clarified scope items shall be included In the scope of services. <br /> Costs for coordination items between drawings,drawings and specifications, A133-3.2.4.1 X <br /> items specified and not drawn,ambiguities in the Contract Documents. <br /> Buyout errors or shortfalls,scope gaps and coordination items between A133-3.2.4.1 X <br /> disciplines. <br /> Damaged Work not covered by insurance. A133-3.2.4.1 X <br /> Unanticipated General Conditions expenses. A133-3.2.4.1 X <br /> Increases in bid subcontracts and subcontractor performance or failure. A133-3.2.4.1 X <br /> Builders Risk Insurance,if paid by Owner. A133-2.0.25&7.6.1 X <br /> Changes in scope of the Work after the GMP that result in Change Order. A133-3.2.4.1.1&6.3.1 X <br /> Concealed or unknown conditions that could not have been reasonably A201-3.7.4 X <br /> anticipated or discovered by the GC/CM during Preconstruction. <br /> X <br /> Regulatory agency changes after the GMP. A133-3.2.4.2.3 <br /> Significant design errors or omissions in the drawings or specs that could not A133-3.2.4.2.4 x <br /> have been reasonably anticipated or discovered by the GC/CM prior to GMP. <br /> Changes required by governmental inspectors to meet requirements beyond A133-3.2.4.2.5 X <br /> those required in regulations. <br /> X <br /> Adjustments to allowances contained within the GMP. A201-3.8.2.3 <br /> X <br /> State and local sales taxes. A133-2.0.22 <br /> Tests,inspections and reports required by law or otherwise agreed to, <br /> including structural,mechanical,chemical,air and water polution and A133-4.1.4.1 X <br /> hazardous materials. -- <br /> Existing site survey and legal description. A133-4.1.4.2 X <br /> X <br /> Geotechnical engineering investigations and report. A133-4.1.4.3 <br /> X <br /> Initial building permit and fees. A133-14.2.2.1 <br /> X <br /> Independent Testing Agency testing and inspection services. A201-13.5.1 <br /> Subcontractor bid document reproduction prior to GMP. N/A X <br /> Page 11 RH5 Draft Cost Resp Matrix 12-14-21.xlsx <br />