BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-2.06 Review record drawings and investigate the existing conditions at the' <br /> Project'Site to ensure that the Contract Documents will reflect the actual <br /> site conditions. <br /> 1-2.07 Recommend and provide, when requested by the Owner, additional tests <br /> or investigations to verify existing conditions and/or capability of existing <br /> systems. <br /> 1-2.08 Review Design Team's Project schedule to ensure its viability and make <br /> recommendations for change including recommendations for phased <br /> construction if appropriate. <br /> 1-2.09 Review the Final 30% Design Drawings and Specifications and provide <br /> general coordination assessment comments and constructability <br /> comments of the design. <br /> 1-2.10 Prepare a construction cost estimate for the entire Work in CSI modified <br /> Uni-format, or other format as agreed upon by the Owner, based upon the <br /> Final 30% Design documents. Upon completion of the estimate, the <br /> Contractor and the Design Team shall reconcile their estimates and <br /> present to the Owner one estimate of the construction cost based upon <br /> mutually agreed assumptions including: the date of commencement of <br /> construction, duration of construction, escalation factors, design <br /> contingency and Negotiated Support Services costs. The cost estimate <br /> shall be updated to include Owner's and Contractor's document review <br /> comments to achieve a total reconciliation for the 30% Phase. In the event <br /> that the reconciled estimate is higher than the Owner's TCC budget, and as <br /> directed by the Owner, the Contractor shall present to the Owner a list of <br /> VE cost-savings equal to or greater than the amount the estimate exceeds <br /> the budget and continue to work with the Design Team to define a scope <br /> that is within the budget. <br /> 1-2.11 Create a VE tracking system which identifies each VE proposal, provides <br /> a cost estimate of the savings to the Project if the proposal is accepted, <br /> indicates the date by which a decision must be made to incorporate the VE <br /> proposal, indicates the current status of the VE proposal and the team <br /> member with current action, and the date the proposal was accepted or <br /> rejected. <br /> 1-3 Work During the 60% (Design Development) Design Phase <br /> In addition to the general services normally provided by a construction manager or a <br /> contractor during preconstruction, the Contractor shall provide the following services <br /> during the 60% Design Phase: <br /> 1-3.01 Attend bi-weekly Project Management meetings conducted by the Design <br /> Team and the Intermediate and Final 60% Design Phase review meetings <br /> conducted by Owner. (Anticipate a minimum of eight (8) Project <br /> Management meetings at two (2) hours each (includes two (2) cost <br /> estimate meetings), one (1) day each for the Intermediate and the Final <br /> 60% Design Phase review meeting.) <br /> 1-3.02 Provide value engineering and constructability comments and estimating <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 00 50 07-Att.Al <br /> Improvements Attach.Al-2 Scope of Work for Preconstruction Services <br /> RFFP for GC/CM Services <br />