My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Surveying: Not Applicable <br /> D. Owner's Consultants: The consultants under contract with the Owner in preparation <br /> of the Contract Documents are: <br /> GC/CM Advisor <br /> Parametrix <br /> Jim Dugan <br /> 711 Court A, Suite 202 <br /> Tacoma, WA 98402 <br /> (253) 278-8105 <br /> JDudan(a parametrix.com <br /> 1.3 SPECIAL CONDITIONS <br /> A. Description of special conditions of the Work: Refer to RFP Section 2.1 fora description <br /> of the Everett Municipal Building - Public Works Tenant Improvements Project. <br /> 1.4 PERMITS <br /> A. Owner will obtain and pay only for the initial building permit and fees. The GC/CM shall <br /> obtain all additional permits and licenses necessary for the execution of the Work and <br /> pay all permit, utility, miscellaneous, and ancillary fees required. <br /> 1. Owner is not responsible for obtaining and paying for trade permits, including but <br /> not limited to permits for Contractor design-build components. <br /> B. Contractor shall obtain and pay for trade permits such as electrical, HVAC, plumbing, <br /> and other trade permits, including those permits required by the Contract <br /> Documents for Contractor design-build components. <br /> 1. Although the Contractor is responsible for these costs, the costs shall be included <br /> with each applicable subcontract bid package. <br /> C. Contractor shall obtain and pay for all other permits required by Authorities Having <br /> Jurisdiction, such as street use permits, utility permits, and temporary occupancy <br /> permits. The actual cost of these permits shall be a Negotiated Support Services <br /> cost. <br /> 1.5 OWNERS USE OF THE PREMISES <br /> A. During the construction period, the existing facilities will be occupied and operational. <br /> City of Everett personnel, building tenants, vendors, customers, and other community <br /> members may be present in the building and on-site during construction. The city of <br /> Everett and other building tenant personnel, separate contractors, vendors, customers <br /> and the public will require access to the building and site during construction. Coordinate <br /> with the Owner to allow appropriate access during construction. <br /> B. Owner's personnel and separate contractors may be performing ongoing maintenance <br /> and improvements at the site during the construction time period. Cooperate with Owner <br /> and separate contractors to minimize disruption of Owner's ongoing maintenance <br /> activities and work independent of the work under this contract. <br /> City of Everett Municipal Building February 3, 2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect. 01 11 00 <br /> Improvements 01 11 00-3 Summary of Work <br /> RFFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.