My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Visual Matching: Where matching an established sample is required, the <br /> Architect's decision will be final on whether a proposed product matches <br /> satisfactorily. <br /> a. Where there is no product available within the specified product category which <br /> matches satisfactorily, and also complies with other specified requirements, <br /> the contractor shall comply with the provisions of the Contract Documents <br /> concerning substitutions for the selection of a matching product in another <br /> product category. <br /> 5. Visual Selection: Where specified product requirements include the phrase "...as <br /> selected from the manufacturer's standard colors, patterns, textures..." or similar <br /> phrases, select a product and manufacturer that complies with other specified <br /> requirements. Architect will select the color, patterns and texture from the product <br /> line selected. <br /> 1.5 PRODUCT SUBSTITUTION <br /> A. General: <br /> 1. No substitution request will be considered unless submitted in accordance with <br /> the requirements of this Section. <br /> 2. If a bidder or Contractor desires approval of some material or product other than <br /> that specified by the Contract Documents, it must submit a written request for <br /> approval of the proposed substitute item to the Architect in accordance with the <br /> following requirements: <br /> a. All requests must be made on the Owner's Substitution Request Form. <br /> b. After receipt of bid, substitution requests shall be prepared, transmitted, <br /> and processed in accordance with Section 01 33 00 "Submittal Procedures." <br /> 3. Final decision as to whether an item is an equal or acceptable substitution rests solely <br /> with the Architect and Owner. <br /> B. Substitution Requests: Every substitution request must state whether the item offered <br /> is equal or superior to the specified product. The substitute material or product must <br /> be accompanied by its reference in the Contract Documents and complete catalog, <br /> technical and other information. If applicable, include samples showing comparison of <br /> physical and other pertinent characteristics as required to establish equivalence of <br /> acceptability for the proposed application.Where specific test results are required by the <br /> Contract Documents, the comparison data for the proposed item shall be based upon <br /> the same test methods as those specified, or they shall be correlated to clearly <br /> demonstrate comparability. The same warranty of the Work described for the specified <br /> product is required for the substitution. <br /> C. During Bid Period: <br /> 1. Submit the Substitution Request Form prior to the date identified in Section 00 23 <br /> 13 "Instructions to Bidders" that is included with the bid package. <br /> 2. Bidders will be notified by addendum of products accepted in addition to those <br /> specified. No other form of approval, including verbal or implied, is acceptable <br /> as an indicator of accepted substitution requests. <br /> City of Everett Municipal Building February 3, 2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 01 25 00 <br /> Improvements 01 25 00-3 Substitutions <br /> RFFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.