My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 31 00 <br /> PROJECT MANAGEMENT COORDINATION <br /> PART 1 —GENERAL <br /> 1.1 SUMMARY <br /> A. This section specifies administrative and procedural requirements for project <br /> management and coordination during construction, in addition to the requirements <br /> specified elsewhere in the Contract Documents. <br /> B. Owner's forms referenced in this Section include (see Appendix A): <br /> 1. Request for Information (RFI). <br /> 2. Architects Supplemental Instructions. <br /> C. The Owner will encourage the use of an internet-based construction management <br /> system (CMS) for communications and documents controls with the Contractor and <br /> Architect on this Project. The Owner does not have a system in place but will work with <br /> the Contractor and Architect to establish a system that will be beneficial to the team. <br /> 1.2 GENERAL COMMUNICATION <br /> A. The Owner shall designate, in writing, the Owner's Representative for this Project. <br /> B. All verbal communications between Owner, Architect, and Contractor shall be for <br /> clarification and collaboration purposes and are not binding unless issued in writing <br /> from the Architect with approval of the Owner's Representative. <br /> C. Contractor communications by and with Architect's consultants shall be through the <br /> Architect, and Architect's communications by and with the Contractor's Subcontractors <br /> shall be through the Contractor. <br /> D. In case of an emergency: <br /> 1. Contact the Owner's Representative; and <br /> 2. Follow emergency procedures in accordance with Section 01 35 23 "Safety <br /> Requirements- GCCM." <br /> 1.3 CORRESPONDENCE <br /> A. Address all correspondence to Architect with a copy to Owner's Representative. <br /> B. All correspondence to and from Contractor will be routed through the Architect with <br /> a copy to the Owner's Representative. <br /> 1.4 CONTRACTOR REQUEST FOR INFORMATION <br /> A. When field conditions or Contract Documents require clarification or verification by the <br /> Architect or Architect's consultants, a written RFI is to be submitted per the following: <br /> 1. Procedure: Immediately on discovery of the need for interpretation of the Contract <br /> Documents, and if not possible to request interpretation at Project meeting, prepare <br /> and submit an RFI in the form required by Owner and described below. <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant 01 31 00-1 Spec Sect 01 31 00 <br /> Improvements Project Management Coordination <br /> RFFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.