.4 When in the best interests of the Project and when critical to the successful completion of a subcontract <br /> bid package,the Owner and Construction Manager may make a Prebid determination of Subcontractor <br /> eligibility in accordance with RCW 39.10. In addition,if the anticipated subcontract value will exceed$3 <br /> million and the Owner consents,the Construction Manager may select a mechanical Subcontractor,an <br /> electrical Subcontractor,or both,in accordance with the alternative procedure specified in RCW <br /> 39.10.385. <br /> .5 As part of its Subcontracting Plan,the Construction Manager shall promptly notify the Owner of Work <br /> (other than Negotiated Support Services and Specified General Conditions)that it will seek to self- <br /> perform. The Construction Manager,including its subsidiaries and affiliates,may bid on a subcontract <br /> bid package if the Work within the subcontract bid package is customarily performed by the Construction <br /> Manager, if the Construction Manager has,in the Owner's reasonable opinion,aggressively sought <br /> competition, if the bid opening is managed by the Owner,if notification of the Construction's Manager's <br /> intention to bid is included in the public solicitation of bids for the bid package,and if the Construction <br /> Manager otherwise complies with RCW 39.10.In no event may the total value of subcontract work <br /> performed by the Construction Manager exceed thirty percent(30%)of the MACC negotiated as part of <br /> the GMP Amendment.The Construction Manager must provide staff to superintend and manage Work it <br /> performs in subcontract bid packages with individuals separate and distinct from the staff involved in the <br /> overall management of this Contract.The Construction Manager shall coordinate subcontract bid <br /> package Work it performs with the Work of Subcontractors. <br /> .6 The Construction Manager shall require a bid bond from Subcontractors'bidding Work expected to cost <br /> more than$300,000,and all Subcontractors awarded a subcontract in excess of$300,000 shall provide a <br /> performance and payment bond for the subcontract amount. <br /> .7 The Construction Manager's solicitations of subcontract bid packages shall be made in accordance with <br /> the following procedures: <br /> .a A representative from the Project Manager or the Owner will participate at each bid opening to <br /> observe the procedure. <br /> .b Solicitations for bids will be advertised by the Construction Manager at least fourteen(14)days <br /> in advance in the Daily Journal of Commerce and the Everett Herald. <br /> .c Bidders may obtain the bid results by telephone from the Construction Manager. <br /> .d Responsiveness requirements and bidding procedures will be described in each solicitation and <br /> may be reviewed with the Owner prior to a bid opening. <br /> .8 The services performed by the Construction Manager in soliciting subcontract bid packages are covered <br /> under Specified General Conditions. <br /> .9 The Construction Manager shall ensure compliance with RCW 39.10 and with all the above requirements <br /> for Subcontractor solicitation,and subcontracts shall conform to the requirements of RCW 39.10. <br /> .10 The Construction Manager shall promptly contract with the selected bidder and shall promptly deliver a <br /> copy of each subcontract to the Owner. <br /> §3.3.2.2 Subcontracts or other agreements shall conform to the applicable payment provisions of this Agreement,and <br /> shall not be awarded on the basis of cost plus a fee,except for any contracts awarded under RCW 39.10.385 which shall <br /> include a maximum allowable subcontract cost. If a Subcontract is awarded under RCW 39.10.385,the Construction <br /> Manager shall provide in the Subcontract for the Owner to receive the same audit rights with regard to the <br /> Subcontractor as the Owner receives with regard to the Construction Manager,and these Subcontractors shall be audited <br /> prior to final payment in accordance with Article 10. <br /> §3.3.2.3 The Construction Manager shall schedule and conduct weekly progress meetings to discuss such matters as <br /> procedures,progress,coordination,scheduling,and status of the Work.The Owner shall prepare and promptly <br /> distribute minutes to the Architect and Construction Manager. <br /> §3.3.2.4 Upon the execution of the GMP Amendment,the Construction Manager shall prepare and submit to the Owner, <br /> the Project Manager and Architect a construction schedule for the Work(the"Construction Schedule")and submittal <br /> schedule in accordance with Section 3.10 of the revised General Conditions and other Contract Documents.The <br /> Construction Schedule shall be incorporated into the larger Project/Phasing Schedule,including Pre-Construction and <br /> parallel projects,if any,under separate contract.The Construction Manager shall provide regular monitoring and shall <br /> ALA Document A133- - 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The <br /> "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used 1rJ <br /> without permission. This draft was produced by AIA software at 13:10:24 ET on 04/22/2021 under Order No.7856855196 which expires on <br /> 05/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms <br /> of Service. To report copyright violations, e-mail copyright@aia.org. <br /> User Notes: (1279676012) <br />