Laserfiche WebLink
2. Coordinate the Work of all sections to ensure that all fixtures, devices, switches, <br /> outlets, ducts, pipes, and similar items can be installed as shown. <br /> D. Job Site Field Measurements and Templates: <br /> 1. Obtain field measurements required for accurate fabrication and installation of work <br /> included in the Contract Documents. Exact measurements are the Contractor's <br /> responsibility. <br /> 2. Furnish or obtain templates, patterns, and setting instructions as required for <br /> installation of all work. Verify in field. <br /> E. Conservation: Coordinate construction activities to ensure that operations are carried <br /> out with consideration given to conservation of energy, water, and materials. Salvage <br /> materials and equipment involved in performance of, but not actually incorporated into, <br /> the Work. Refer to other Sections for disposition of salvaged materials that are designated <br /> as Owner's property. <br /> PART 2 —PRODUCTS (NOT USED) <br /> PART 3— EXECUTION (NOT USED) <br /> END OF SECTION <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant 01 31 00-6 Spec Sect 01 31 00 <br /> Improvements Project Management Coordination <br /> RFFP for GC/CM Services <br />