BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor is to cooperate with the Owner in coordination of all work to prevent <br /> impact to this or other Owner sponsored construction projects. <br /> 3. Cooperation with building occupants or occupants on adjoining properties may <br /> be required when scheduling construction activities that create excessive noise or <br /> structure-borne vibration. The Contractor is to cooperate with the Owner in <br /> coordination of all work to minimize these impacts to the Owner's operations (see <br /> Section 01 50 00"Temporary Facilities and Controls - GCCM"). <br /> B. Special Coordination: <br /> 1. The Contractor is responsible for receiving, unloading, storage and handling of <br /> Owner Furnished Contractor Installed (OFCI) items from the time of receipt <br /> through Substantial Completion. <br /> a. The Contractor is responsible for protecting OFCI and Owner Existing Contractor <br /> Installed (OECI) items from damage, such as: damage from exposure to <br /> the elements; or from damage to a warranty due to Contractor's improper <br /> installation and testing. The costs to repair or replace items damaged while in the <br /> Contractor's possession shall be borne by the Contractor. <br /> 1) The Contractor shall consult with the Owner to determine the warranty <br /> requirements of OFCI and OECI items. <br /> 2. Early Completion of Data and Low Voltage Systems: One month minimum prior to <br /> the date required for the first inspection and testing of elevator, fire alarm systems, <br /> or other systems required by AHJ for Substantial Completion, or for Owner's Prior <br /> Occupancy, the Contractor shall complete the Work of new MDF and IDF rooms, in <br /> order for the Owner to install Owner Furnished Owner Installed (OFOI) <br /> communications, data and low-voltage equipment required for early building <br /> services activation. The Work includes, but is not limited to, the following: <br /> a. Install all finishes and products specified for the MDF and IDF rooms and provide <br /> complete mechanical and electrical services for the rooms. <br /> b. All necessary Contractor Furnished Contractor Installed (CFCI) equipment and <br /> materials including data racks, cabinets, patch panels, other CFCI work required <br /> for the early service outlet locations and installation of OFO1 equipment shall be <br /> completed. <br /> c. Install doors and locks and provide three (3) sets of keys to the Owner. <br /> d. All necessary CFCI conduit pathways between the MDF and IDF rooms shall be <br /> installed and CFCI room cable required for the early service outlet locations and <br /> installation of OFOI equipment shall be terminated and tested and the test results <br /> provided to the Architect and Owner. <br /> e. The entire room and all components shall be entirely HEPA vacuumed. No <br /> dusting or sweeping is allowed. The rooms must be dust-free and <br /> maintained by Contractor dust-free until Substantial Completion. <br /> C. Mechanical and Electrical Coordination: <br /> 1. Resolve all tight or restricted conditions involving work of various sections in advance <br /> of installation. <br /> City of Everett Municipal Building February 3, 2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 01 31 00 <br /> improvements 01 31 00-5 Project Management Coordination <br /> RFFP for GC/CM Services <br />