BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
preliminary Progress Schedule utilizing a Critical Path Method (CPM) logic, based on <br /> the Contract Documents. The Architect and Owner will review the preliminary schedule <br /> for conformance with the Contract Documents and provide comments within fourteen <br /> (14) calendar days of receipt from the Contractor. The Contractor shall respond to all <br /> comments and provide the Architect and Owner a Baseline Progress Schedule within <br /> fourteen (14) calendar days of receipt of the Architect's comments. <br /> B. Once the Baseline Progress Schedule is submitted to the Architect and Owner, the <br /> Progress Schedule shall be formally established as the baseline file within the <br /> Contractor's scheduling software. This baseline file shall not be modified without the <br /> Architect's written approval. <br /> 1. The schedule of values line item for Baseline Project Schedule and Monthly Project <br /> Schedule, specified in Section 01 29 76, shall be withheld from the Contractor's <br /> monthly Application for Payment if the Baseline Progress Schedule is past due. <br /> C. The Baseline Progress Schedule shall be the basis that the Contractor shall use: plan, <br /> organize, and execute the Work; record and report actual performance and progress <br /> through updates, and; show how the Contractor plans to complete all remaining Work. <br /> The Baseline Progress Schedule and monthly Progress Schedule updates shall be <br /> the basis for consideration and analysis of requests for time extensions as specified <br /> below. The schedule shall be in the form of an activity-oriented precedence network <br /> diagram. <br /> D. The Baseline Progress Schedule and monthly Progress Schedule updates shall <br /> be constructed to show the order in which the Contractor proposes to carry out the Work <br /> and to indicate the restrictions of access to and availability of work area, and availability <br /> and use of manpower, materials, equipment, and include all activities of trade <br /> contractors, equipment vendors, suppliers, and Negotiated Support Services expenses. <br /> The Progress Schedule shall incorporate contractually specified limitations and <br /> restrictions, and contractually specified milestones.Construction activities shall match or <br /> be correlated with the pay items in the approved Schedule of Values. The Progress <br /> Schedule shall be prepared in sufficient detail with the assignment and coding of <br /> all activities by the <br /> Contractor and Subcontractors in consideration of, but not limited to, the following Work <br /> activities: <br /> 1. Access and availability to the Project Site, including road closures; <br /> 2. Interfaces and dependencies with preceding, concurrent, and succeeding <br /> contractors, if applicable; <br /> 3. The type of work to be performed and labor trades involved; <br /> 4. All procurement, manufacturing, fabrication (both on-site and off-site), and delivery <br /> activities for all major materials and equipment; <br /> 5. Shutdowns of existing Owner's equipment and utility services; <br /> 6. Required delivery dates of OFCI equipment and materials; <br /> 7. Testing, air balancing, and commissioning activities, including submission and <br /> approval of test results; <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 01 32 16 <br /> Improvements 01 32 16-2 Construction Progress Schedule <br /> RFFP for GC/CM Services <br />