BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Approvals required by regulatory agencies or other third parties, including obtaining <br /> an Occupancy Permit; <br /> 9. Coordination for Owner's occupancy including Owner's cleaning, OFOI equipment <br /> and furnishings installations; <br /> 10. Planning for phased occupancy by the Owner, with intermediate completion dates; <br /> 11. Contractor's preliminary cleaning and final cleaning operations; <br /> 12. Contractor's Final Punchlist Report, Architect's Final Inspection (Punchlist), <br /> Contractor's corrections, and Architect's re-inspection; <br /> 13. Substantial Completion and Final Completion activities and milestones, and Final <br /> Acceptance. <br /> E. The activities defined in the Progress Schedule shall represent the planned durations <br /> in anticipation of normal man-power and equipment utilization in durations of whole <br /> working days. No activity durations shall exceed twenty two (22) working days. If <br /> approved by the Architect and Owner, longer durations may be allowed for non- <br /> construction activities such as procurement,delivery,or submittal activities.All durations <br /> shall be determined based upon resource planning under contractually defined on site <br /> work conditions. In calculating activity durations, normal inclement weather shall be <br /> considered. The Contractor shall schedule the Work to minimize the effect of adverse <br /> weather. The Contractor shall also protect the work site from the effects of adverse <br /> weather or take other necessary measures such that the Work can be completed within <br /> the time established in the Contract Documents and include these provisions in the <br /> schedule as appropriate. <br /> F. Schedule activity identification codes shall not be alphanumeric unless approved <br /> by Owner and Architect. <br /> 1. Activity Description: Provide adequate information to readily identify each activity <br /> up to 48 characters in the general descriptive format: action, item, location (such as <br /> Install Steel Studs 3rd Floor). <br /> 2. Activity Codes: The Contractor shall develop and provide a complete, efficient and <br /> understandable Work Breakdown Structure (WBS) code to submit to the Owner <br /> for review and approval. In addition to the WBS, activity codes may be created <br /> and assigned a conventional WBS scheme, activity codes shall be used in lieu of the <br /> WBS. Suggested character fields for the code structure are: <br /> Name Length Description <br /> PHAS 1 Phase or stage <br /> TYPE 4 Type of activity <br /> FLOR 1 Floor <br /> AREA 4 Area and/or room <br /> RESP 7 Responsible party <br /> City of Everett Municipal Building February 3, 2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 01 32 16 <br /> Improvements 01 32 16-3 Construction Progress Schedule <br /> RFFP for GC/CM Services <br />