BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upon request,Construction Manager shall provide the Owner with supporting documentation from its insurer and <br /> surety of any associated cost incurred.Construction Manager is not entitled to any increased premium on any retainage <br /> bond as such bonds are optional. If the Construction Manager performs Work as a Subcontractor(i.e.on a package on <br /> which the Construction Manager was the low Subcontractor-bidder),the Construction Manager shall be paid the Fee as <br /> provided in Section 7.5.6 of the A201 but shall not have the above Fee percentage applied to such Changed Work <br /> • 6.1.5 Rental rates for Construction Manager-owned equipment shall not exceed the rates identified in Section 7.5.2 <br /> § 6.1.6 Liquidated damages,if any,shall be established in the GMP Amendment. <br /> § 6.1.7 Other: <br /> (Insert provisions for bonus, cost savings or other incentives, if any, that might result in a change to the Contract Sum.) <br /> There are no shared savings provisions;all savings shall revert to the Owner. <br /> §6.1.8 The Specified General Conditions are in the fixed amount of One Million Two Hundred Thirty Eight Thousand <br /> Seyen Hundred Forty Five Dollars($ 1,238,754.00)based on the level of staffing and project duration known at the <br /> time of fee proposal submission. The final Specified General Conditions sum shall be negotiated based on the level of <br /> staffmg and duration of service required for Construction Manager's management staff The weekly unit rates are <br /> quoted in the Fee Proposal and Preconstruction Cost Proposal Form. <br /> §6.1.9 The allowance for Negotiated Support Services will be negotiated at the time of establishing the MACC. <br /> § 6.2 Guaranteed Maximum Price <br /> The Construction Manager guarantees that the Contract Sum shall not exceed the Guaranteed Maximum Price set forth <br /> in the Guaranteed Maximum Price Amendment,as it is amended from time to time. To the extent the Cost of the Work, <br /> Negotiated Support Services,Specified General Conditions,the Construction Manager's Contingency,plus the <br /> Construction Manager's Fee exceeds the Guaranteed Maximum Price,the Construction Manager shall bear such costs <br /> in excess of the Guaranteed Maximum Price without reimbursement or additional compensation from the Owner. <br /> § 6.3 Changes in the Work <br /> § 6.3.1 The Owner may,without invalidating the Contract,order changes in the Work within the general scope of the <br /> Contract consisting of additions,deletions or other revisions.The Owner shall issue such changes in writing. The <br /> Construction Manager may be entitled to an equitable adjustment in the Contract Time as a result of changes in the <br /> Work. <br /> § 6.3.1.1 The Architect or Owner may order minor changes in the Work as provided in Article 7 of AIA Document <br /> A201-2017,General Conditions of the Contract for Construction. <br /> § 6.3.2 Adjustments to the Guaranteed Maximum Price on account of changes in the Work subsequent to the execution <br /> of the Guaranteed Maximum Price Amendment may be determined by any of the methods listed in Article 7 of AIA <br /> Document A201-2017,General Conditions of the Contract for Construction. <br /> § 6.3.3 In calculating adjustments to subcontracts(except those awarded with the Owner's prior consent on the basis of <br /> cost plus a fee),the terms"cost"and"fee"as used in Section 7.3.3.3 of the revised General Conditions and the term <br /> "costs"as used in Section 7.3.7 of the revised General Conditions shall have the meanings assigned to them in Section <br /> 7.5 of the revised General Conditions and shall not be modified by Sections 6.1 and 6.2, Sections 7.1 through 7.6,and <br /> Section 7.9 of this Agreement.Adjustments to subcontracts awarded with the Owner's prior consent on the basis of cost <br /> plus a fee shall be calculated in accordance with the terms of those subcontracts and the Contract Documents. <br /> § 6.3.4 In calculating adjustments to the Guaranteed Maximum Price,the terms"cost"and"costs"as used in Article 7 <br /> of AIA Document A201-2017 shall mean the Cost of the Work as defined in Article 7 of this Agreement and the term <br /> "fee"shall mean the Construction Manager's Fee as defined in Section 6.1.2 of this Agreement. <br /> § 6.3.5 If no specific provision is made in Section 6.1.3 for adjustment of the Construction Manager's Fee in the case of <br /> changes in the Work,or if the extent of such changes is such,in the aggregate,that application of the adjustment <br /> provisions of Section 6.1.3 will cause substantial inequity to the Owner or Construction Manager,the Construction <br /> AIA Document A133' - 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The <br /> "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used 20 <br /> without permission. This draft was produced by AIA software at 13:10:24 ET on 04/22/2021 under Order No.7856855196 which expires on <br /> 05/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms <br /> of Service. To report copyright violations, e-mail copyright@aia.org. <br /> User Notes: (1279676012) <br />