My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location,subject to the <br /> Owner's prior approval. <br /> §7.5.6 Notwithstanding the above,costs of other material and equipment,temporary facilities and related items <br /> procured by the Construction Manager will generally be included in Negotiated Support Services,but some may be <br /> designated for inclusion in the Specified General Conditions.Reference the Cost Responsibility Matrix Exhibit for <br /> clarification of such items.All furniture,technology,communication(including cell phones),personal transportation <br /> (including pickup trucks)and clerical equipment therein,temporary controls(except cleaning and erosion controls), <br /> project identification and temporary signage,and delivery by the Construction Manager,on-site storage,sheds and <br /> handling are Specified General Conditions. <br /> § 7.6 Miscellaneous Costs <br /> § 7.6.1 The actual,net costs of premiums for that portion of insurance and bonds required by the Contract Documents <br /> that can be directly attributed to this Contract are included in the Specified General Conditions and are not separately <br /> reimbursable. <br /> §7.6.2 Use or similar taxes,B&O and income taxes imposed by a governmental authority that are related to the Work <br /> and for which the Construction Manager is liable are included in the Fee and are not separately reimbursable. Sales tax <br /> on the Contract Sum is paid with and based upon each Application for Payment. <br /> §7.6.3 Fees and assessments for Project-specific permits,licenses and inspections of governmental authorities having <br /> jurisdiction for which the Construction Manager(but not Subcontractors)is required by the Contract Documents to pay. <br /> §7.6.4 Fees of laboratories for tests required of the Construction Manager by the Contract Documents,except those <br /> related to defective or nonconforming Work for which reimbursement is excluded by Section 13.5.3 of the revised <br /> General Conditions or by other provisions of the Contract Documents,and which do not fall within the scope of Section <br /> 7.7.3. <br /> §7.6.5 Royalties and license fees paid for the use of a particular design,process or product required by the Contract <br /> Documents;the cost of defending suits or claims for infringement of patent rights arising from such requirement of the <br /> Contract Documents;and payments made in accordance with legal judgments against the Construction Manager <br /> resulting from such suits or claims and payments of settlements made with the Owner's consent.However,such costs of <br /> legal defenses,judgments and settlements shall not be included in the calculation of the Construction Manager's Fee or <br /> subject to the Guaranteed Maximum Price.If such royalties,fees and costs are excluded by the last sentence of Section <br /> 3.17 of the revised General Conditions or other provisions of the Contract Documents,then they shall not be included in <br /> the Cost of the Work. <br /> §7.6.6 Costs for electronic equipment and software,including computers,are included in Specified General Conditions <br /> and are not separately reimbursable. <br /> §7.6.7 Deposits lost for causes other than the Construction Manager's negligence or failure to fulfill a specific <br /> responsibility in the Contract Documents. <br /> §7.6.8 Expenses incurred in accordance with the Construction Manager's standard written personnel policy for <br /> relocation and temporary living allowances of the Construction Manager's personnel required for the Work are included <br /> in Specified General Conditions and are not separately reimbursable. <br /> §7.6.9 The cost of preapproved warehousing of stored materials or equipment subsequently incorporated into the Work. <br /> § 7.7 Other Costs and Emergencies <br /> § 7.7.1 Other costs incurred in the performance of the Work,with the Owner's prior written approval. <br /> § 7.7.2 Costs incurred in taking action to prevent threatened damage,injury,or loss,in case of an emergency affecting <br /> the safety of persons and property,as provided in Article 10 of AIA Document A201-2017,as revised. <br /> § 7.7.3 Costs of repairing or correcting damaged or nonconforming Work executed by the Construction Manager, <br /> Subcontractors,or suppliers,provided that such damaged or nonconforming Work was not caused by the negligence of, <br /> AIA Document A133' - 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The <br /> "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used 23 <br /> without permission. This draft was produced by AIA software at 13:10:24 ET on 04/22/2021 under Order No.7856855196 which expires on <br /> 05/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms <br /> of Service. To report copyright violations, e-mail copyright@aia.org. <br /> User Notes: (1279676012) <br />
The URL can be used to link to this page
Your browser does not support the video tag.