§ 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location,subject to the <br /> Owner's prior approval. <br /> §7.5.6 Notwithstanding the above,costs of other material and equipment,temporary facilities and related items <br /> procured by the Construction Manager will generally be included in Negotiated Support Services,but some may be <br /> designated for inclusion in the Specified General Conditions.Reference the Cost Responsibility Matrix Exhibit for <br /> clarification of such items.All furniture,technology,communication(including cell phones),personal transportation <br /> (including pickup trucks)and clerical equipment therein,temporary controls(except cleaning and erosion controls), <br /> project identification and temporary signage,and delivery by the Construction Manager,on-site storage,sheds and <br /> handling are Specified General Conditions. <br /> § 7.6 Miscellaneous Costs <br /> § 7.6.1 The actual,net costs of premiums for that portion of insurance and bonds required by the Contract Documents <br /> that can be directly attributed to this Contract are included in the Specified General Conditions and are not separately <br /> reimbursable. <br /> §7.6.2 Use or similar taxes,B&O and income taxes imposed by a governmental authority that are related to the Work <br /> and for which the Construction Manager is liable are included in the Fee and are not separately reimbursable. Sales tax <br /> on the Contract Sum is paid with and based upon each Application for Payment. <br /> §7.6.3 Fees and assessments for Project-specific permits,licenses and inspections of governmental authorities having <br /> jurisdiction for which the Construction Manager(but not Subcontractors)is required by the Contract Documents to pay. <br /> §7.6.4 Fees of laboratories for tests required of the Construction Manager by the Contract Documents,except those <br /> related to defective or nonconforming Work for which reimbursement is excluded by Section 13.5.3 of the revised <br /> General Conditions or by other provisions of the Contract Documents,and which do not fall within the scope of Section <br /> 7.7.3. <br /> §7.6.5 Royalties and license fees paid for the use of a particular design,process or product required by the Contract <br /> Documents;the cost of defending suits or claims for infringement of patent rights arising from such requirement of the <br /> Contract Documents;and payments made in accordance with legal judgments against the Construction Manager <br /> resulting from such suits or claims and payments of settlements made with the Owner's consent.However,such costs of <br /> legal defenses,judgments and settlements shall not be included in the calculation of the Construction Manager's Fee or <br /> subject to the Guaranteed Maximum Price.If such royalties,fees and costs are excluded by the last sentence of Section <br /> 3.17 of the revised General Conditions or other provisions of the Contract Documents,then they shall not be included in <br /> the Cost of the Work. <br /> §7.6.6 Costs for electronic equipment and software,including computers,are included in Specified General Conditions <br /> and are not separately reimbursable. <br /> §7.6.7 Deposits lost for causes other than the Construction Manager's negligence or failure to fulfill a specific <br /> responsibility in the Contract Documents. <br /> §7.6.8 Expenses incurred in accordance with the Construction Manager's standard written personnel policy for <br /> relocation and temporary living allowances of the Construction Manager's personnel required for the Work are included <br /> in Specified General Conditions and are not separately reimbursable. <br /> §7.6.9 The cost of preapproved warehousing of stored materials or equipment subsequently incorporated into the Work. <br /> § 7.7 Other Costs and Emergencies <br /> § 7.7.1 Other costs incurred in the performance of the Work,with the Owner's prior written approval. <br /> § 7.7.2 Costs incurred in taking action to prevent threatened damage,injury,or loss,in case of an emergency affecting <br /> the safety of persons and property,as provided in Article 10 of AIA Document A201-2017,as revised. <br /> § 7.7.3 Costs of repairing or correcting damaged or nonconforming Work executed by the Construction Manager, <br /> Subcontractors,or suppliers,provided that such damaged or nonconforming Work was not caused by the negligence of, <br /> AIA Document A133' - 2019. Copyright © 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The <br /> "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used 23 <br /> without permission. This draft was produced by AIA software at 13:10:24 ET on 04/22/2021 under Order No.7856855196 which expires on <br /> 05/01/2022, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms <br /> of Service. To report copyright violations, e-mail copyright@aia.org. <br /> User Notes: (1279676012) <br />