1.0 INTRODUCTION
<br /> The City of Everett(City or Owner) is requesting RFP Proposals from highly qualified,
<br /> prospective General Contractor/Construction Manager firms (GC/CM, Firm or Contractor)for
<br /> Preconstruction Services and potential construction of the Everett Municipal Building—Public
<br /> Works Tenant Improvement Project.
<br /> The selected GC/CM Firm shall:
<br /> • Support an integrated GC/CM delivery model with the Owner, Architect, Parametrix,
<br /> and other consultants to maximize Project value and quality.
<br /> • Provide preconstruction consulting services that include cost estimating,
<br /> scheduling, phasing, logistics planning, value engineering reviews,
<br /> recommendations, constructability reviews, recommendations, material selection,
<br /> building system selection,and risk mitigation.
<br /> • Provide integrated use of current design and construction technology, including
<br /> Building Information Modeling and Virtual Design and Construction as part of the pre-
<br /> construction and construction process.
<br /> • Assist in determining performance goals with the Project team for designing, planning,
<br /> and executing the Project.
<br /> If the GC/CM Firm and Owner can successfully negotiate an acceptable Guaranteed Maximum Price
<br /> (GMP)and the GC/CM Firm is contracted to serve as the Contractor, they shall:
<br /> • Solicit and manage subcontractor and supplier procurement and bidding.
<br /> • Provide construction services to deliver the Project safely, on time, and within budget.
<br /> As defined under 39.10 RCW, Alternative Public Works Contracting Procedures, the Owner
<br /> intends to award a contract for GC/CM services ("GC/CM Contract") utilizing a three-step
<br /> competitive process to select the GC/CM Contractor.The three-step process is described in
<br /> Section 4.0.
<br /> The City's project team includes City staff, Parametrix as the GC/CM Advisor and Support,
<br /> Mackenzie(Architects),and consultants. Key Project team members include:
<br /> • Bob Leonard, Director, City of Everett Parks&Facilities
<br /> • Jeff Harris, Assistant Director, City of Everett Parks & Facilities
<br /> • Ruben Sanchez, Planning &Capital Development Manager, City of Everett Parks &
<br /> Facilities
<br /> • Kim Doyle, Project Manager Senior Associate, Mackenzie
<br /> • Theresa Bauccio-Teschlog, Procurement Manager, City of Everett
<br /> • Jim Dugan, GC/CM Advisor, Parametrix
<br /> • Dan Cody, GC/CM Procurement/Project Manager, Parametrix
<br /> • Doug Wiser, Project Manager PM/CM, Parametrix
<br /> 2.0 PROJECT DESCRIPTION AND REASONS FOR USING GC/CM DELIVERY
<br /> 2.1 Project Scope
<br /> The City of Everett Municipal Building is a 10-story, mid-rise office building of approximately
<br /> 117,800 sf located in downtown Everett at 2930 Wetmore Avenue, Everett, WA 98201.The
<br /> building houses many of the City's Administrative and Support functions, including the Police
<br /> Department, Engineering, Public Utilities, Human Resources, Permitting Services, and the
<br /> Prosecutor's Office.The building was constructed in 1980 with concrete and steel construction,
<br /> City of Everett
<br /> Everett Municipal Building
<br /> Public Works Tenant Improvements 2
<br /> RFP for GC/CM Services