Laserfiche WebLink
1.0 INTRODUCTION <br /> The City of Everett(City or Owner) is requesting RFP Proposals from highly qualified, <br /> prospective General Contractor/Construction Manager firms (GC/CM, Firm or Contractor)for <br /> Preconstruction Services and potential construction of the Everett Municipal Building—Public <br /> Works Tenant Improvement Project. <br /> The selected GC/CM Firm shall: <br /> • Support an integrated GC/CM delivery model with the Owner, Architect, Parametrix, <br /> and other consultants to maximize Project value and quality. <br /> • Provide preconstruction consulting services that include cost estimating, <br /> scheduling, phasing, logistics planning, value engineering reviews, <br /> recommendations, constructability reviews, recommendations, material selection, <br /> building system selection,and risk mitigation. <br /> • Provide integrated use of current design and construction technology, including <br /> Building Information Modeling and Virtual Design and Construction as part of the pre- <br /> construction and construction process. <br /> • Assist in determining performance goals with the Project team for designing, planning, <br /> and executing the Project. <br /> If the GC/CM Firm and Owner can successfully negotiate an acceptable Guaranteed Maximum Price <br /> (GMP)and the GC/CM Firm is contracted to serve as the Contractor, they shall: <br /> • Solicit and manage subcontractor and supplier procurement and bidding. <br /> • Provide construction services to deliver the Project safely, on time, and within budget. <br /> As defined under 39.10 RCW, Alternative Public Works Contracting Procedures, the Owner <br /> intends to award a contract for GC/CM services ("GC/CM Contract") utilizing a three-step <br /> competitive process to select the GC/CM Contractor.The three-step process is described in <br /> Section 4.0. <br /> The City's project team includes City staff, Parametrix as the GC/CM Advisor and Support, <br /> Mackenzie(Architects),and consultants. Key Project team members include: <br /> • Bob Leonard, Director, City of Everett Parks&Facilities <br /> • Jeff Harris, Assistant Director, City of Everett Parks & Facilities <br /> • Ruben Sanchez, Planning &Capital Development Manager, City of Everett Parks & <br /> Facilities <br /> • Kim Doyle, Project Manager Senior Associate, Mackenzie <br /> • Theresa Bauccio-Teschlog, Procurement Manager, City of Everett <br /> • Jim Dugan, GC/CM Advisor, Parametrix <br /> • Dan Cody, GC/CM Procurement/Project Manager, Parametrix <br /> • Doug Wiser, Project Manager PM/CM, Parametrix <br /> 2.0 PROJECT DESCRIPTION AND REASONS FOR USING GC/CM DELIVERY <br /> 2.1 Project Scope <br /> The City of Everett Municipal Building is a 10-story, mid-rise office building of approximately <br /> 117,800 sf located in downtown Everett at 2930 Wetmore Avenue, Everett, WA 98201.The <br /> building houses many of the City's Administrative and Support functions, including the Police <br /> Department, Engineering, Public Utilities, Human Resources, Permitting Services, and the <br /> Prosecutor's Office.The building was constructed in 1980 with concrete and steel construction, <br /> City of Everett <br /> Everett Municipal Building <br /> Public Works Tenant Improvements 2 <br /> RFP for GC/CM Services <br />