BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is anticipated to minimize impacts on the facility's continued operation. Early procurement and bid <br /> packages will be considered and may be utilized to maximize construction efficiency, take the best <br /> advantage of seasons and weather, meet the Project schedule, and minimize cost impacts due to <br /> weather and bid climate. <br /> 2.3 Funding <br /> The utility-funded part of the project will be funded from a combination of revenue bonds and <br /> capital cash reserves and has been included in the City's ten (10)-year capital planning budget. <br /> Funding for the NE design, GC/CM advisor services, and GC/CM preconstruction services are <br /> being provided from the cash reserves until the revenue bonds are in place.The remaining cost <br /> of project manager/construction manager (PM/CM) services, design services, and project <br /> construction will be funded from a combination of funds from the revenue bonds and the cash <br /> reserves. The General Government portion will be paid using a variety of cash reserves from <br /> CIP 1 and a temporary inter-fund loan from Utilities that will be refinanced through a GO bond <br /> issue towards the end of 2024. <br /> 2.4 Reason for Using the GC/CM Delivery Method <br /> The Owner desires to retain the GC/CM Firm as a partner early in the Project to work with <br /> the Project team to research and document existing conditions and refine and confirm overall <br /> Project goals. These goals include budget, Project scope, Project phasing, Project schedule, <br /> and potential bid packages. <br /> By delivering the Project using the GC/CM delivery method, the Owner will benefit from the <br /> knowledge and experience of the selected GC/CM Firm to obtain a high-value and high- <br /> quality Project on time and within budget. The Owner believes the Project's success depends <br /> greatly on the knowledge, experience, leadership skills, qualifications, and culture of the <br /> selected GC/CM Firm's staff providing preconstruction and construction services. <br /> The Owner expects that the GC/CM procurement and Project delivery method will provide a <br /> direct benefit through the following: greater cost certainty associated with the guaranteed <br /> maximum price; reduced claim risks; reduced change orders; opportunity to optimize scope, <br /> delivery, and overall schedule for the work that is subject to critical phasing and schedule <br /> requirements. <br /> 3.0 SCOPE OF GC/CM SERVICES <br /> The scope of services will be provided in the GC/CM Contract as executed between the Owner <br /> and the GC/CM Contractor. The description of the scope below is only a preliminary summary. <br /> 3.1 General <br /> The Owner seeks a highly qualified, customer-focused GC/CM Firm to collaborate with and <br /> participate as a critical, integrated team member throughout the design, preconstruction, and <br /> construction phases.The successful GC/CM Firm shall demonstrate highly effective involvement <br /> in Preconstruction Services, including early scope development, estimating, constructability <br /> reviews,value engineering recommendations,and risk management.The GC/CM Firm will work <br /> closely with the Owner and the design team through design/preconstruction, construction, and <br /> commissioning to maximize the value and quality of the Project and achieve the end goal leading <br /> to cost-effective construction, efficient facility operations, and minimizing maintenance costs. <br /> The successful GC/CM Firm shall demonstrate its qualifications and relevant experience by: <br /> • Demonstrating outstanding knowledge and skills in construction management, cost- <br /> estimating, collaboration with the Project team, subcontractor, and supplier buyout, <br /> City of Everett <br /> Everett Municipal Building <br /> Public Works Tenant Improvements 5 <br /> RFP for GC/CM Services <br />