My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
obtaining maximum value, price competitiveness, and encouraging both local <br /> subcontractors, supplier, and disadvantaged business participation. <br /> • Demonstrating an understanding of the aspects of work in Snohomish County and <br /> specifically within the City of Everett, including the availability and procurement of <br /> products, materials, equipment, freight, labor, and other factors affecting price or <br /> schedule. <br /> • Demonstrating experience and success working in an occupied environment and safely <br /> conducting construction activities adjacent to active operational facilities, staff, and the <br /> public. <br /> • Demonstrating experience with sustainable design and construction practices. <br /> If selected as the GC/CM Contractor, the GC/CM Firm shall provide all services typical of a <br /> general contractor, including, but not limited to: <br /> • Competitive bidding of subcontractor and supplier work utilizing competitive bidding in <br /> compliance with State of Washington statutes related to public procurement, including <br /> RCW Chapter 39.10 <br /> • CPM scheduling <br /> • On-site supervision <br /> • Subcontractor coordination <br /> • Safety leadership <br /> • Construction meeting organization <br /> • Communications <br /> • Maintenance of a clean Project site <br /> • Training of Owner's staff <br /> • Coordination with the Owner's other consultants, such as independent commissioning <br /> agents and special inspection agencies <br /> • Coordination with the Owner's contractors with separate,simultaneous contracts related <br /> to the work. <br /> • Implementation and evaluation of sustainable design and construction practices. Note <br /> that the City of Everett supports sustainable practices but is not seeking LEED <br /> certification for this Project. <br /> 3.2 Preconstruction Services <br /> During preconstruction,the GC/CM Firm shall work collaboratively and proactively with the Owner <br /> and the Owner's Project Manager, GC/CM Advisor, PM/CM Consultant, Architect, and other <br /> Design Team members. The GC/CM Firm shall be responsible for providing necessary <br /> consulting expertise to the Owner to ensure that the program scope is maximized and the <br /> construction budget and the Project schedule will be met. <br /> The GC/CM Firm shall provide construction management advice during the preconstruction <br /> period that includes but is not limited to the following: <br /> • Recommending cost-effective phasing and sequencing of work and construction <br /> schedule based on achieving Project goals. <br /> • Identifying alternative construction means/methods/options for cost savings or <br /> construction efficiency, coordinating with the Owner & Design Team, track/log their <br /> acceptance/rejection, and implementing accepted recommendations into the Project <br /> documents. <br /> City of Everett <br /> Everett Municipal Building <br /> Public Works Tenant Improvements 6 <br /> RFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.