BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In each profile, provide the following: <br /> • Project photo(s), <br /> • Short description of the Project and how it is similar to this Project, <br /> • Contracted duration of construction, <br /> • Actual duration of construction, <br /> • Contracted construction value, <br /> • Final cost of construction, <br /> • Contact information for both the Owner and Designer, including the manager who is <br /> familiar with your firm's performance, <br /> • Note if any of the individuals named in your Project team participated as members of <br /> the profiled Project. <br /> • Indicate which Projects were completed using alternative delivery(cost-reimbursable <br /> basis(GC/CM, CM/GC or similar),negotiated contract, or design-build)or had similar <br /> elements and services to those delivery methods. <br /> 5.5 Project Approach: <br /> The purpose of subsection 5.5 is to evaluate your firm's approach to executing the Project, <br /> including the ability to meet the Project time and budget requirements. <br /> Describe your overall approach to maximizing the value of your Preconstruction, Bidding, and <br /> Construction Services. In addition, briefly address the following Project issues and provide <br /> your firm's plan for the following: <br /> • Integrating your services with the Owner, design team, and GC/CM Consultant to <br /> support and ensure the success of the Project. <br /> • Providing preconstruction services. <br /> • Maximizing value and success of the preconstruction phase. <br /> • Tracking Project costs and providing accurate budget forecasting during <br /> preconstruction and construction phases. <br /> • Providing realistic cost estimates during the preconstruction phase that avoids overly <br /> conservative estimates. <br /> • Attracting subcontractor and supplier interest in the Project, including local <br /> businesses, small business enterprises, and socially and economically <br /> disadvantaged business enterprises. <br /> • Competitive and successful material and subcontractor buyout. <br /> • Use of BIM technology for the Project during Preconstruction and Construction. <br /> • Scope of work your firm proposes to self-perform and its past performance of that <br /> scope of work. How will you ensure price competition in this scope of work? <br /> • Successfully managing and completing a Project with critical phasing, phased <br /> completion, and move-in dates. Address how your firm would work on an occupied <br /> site with limited room for contractor staging, parking, and construction trailers. <br /> 5.6 Location and Workload: <br /> Provide the following information about your firm's location and range of work: <br /> • Address of firm's headquarters or corporate office. <br /> • Address of the local office that will oversee and manage the Project. <br /> • Current geographic range of your entire company's work. <br /> City of Everett <br /> Everett Municipal Building <br /> Public Works Tenant Improvements 14 <br /> RFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.