My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2.8 Draft copies of the GC/CM Contract (including the General Conditions) have been <br /> included with the RFFP. <br /> 3.2.9 No other entries, modifications, or qualifications shall be made to the RFFP Final Proposal <br /> Form. Failure to fully comply with these requirements may be grounds for an RFFP Final <br /> Proposal being declared non-responsive. The Owner reserves the right to reject any or all <br /> RFFP Final Proposals and to waive, as an informality, any non-material irregularities in <br /> the RFFP Final Proposals received. <br /> 4. Taxes <br /> 4.1 The Final Proposal shall include all taxes imposed by law except Washington State Sales <br /> Tax. State sales tax shall not be included in the total Bid. <br /> 5. Submission and Withdrawal of Bids <br /> 5.1 The RFFP Final Proposals must be submitted in sealed envelopes or packages and <br /> clearly marked as"(GC/CM Name), RFFP Final Proposal, RFP 22-101, "Everett Municipal <br /> Building Public Works Tenant Improvements." It is recommended that Proposers use the <br /> label below. Delivered proposals are accepted Monday through Friday, from 8:00 am to <br /> 3:00 p.m., excluding city-observed holidays. If submitting in person, call (425) 257-8901 <br /> to access the locked elevator. <br /> RFFP Final Proposals must be received by no later than the time and date identified in <br /> RFP Section 2.2, unless modified by addendum, and must be delivered by hand (in person <br /> or by couriers such as UPS or Fed Ex)to: <br /> City of Everett <br /> Attn: Theresa Bauccio-Teschlog, MBA, NIGP-CPP, CPPB <br /> Procurement Manager <br /> 2930 Wetmore Avenue, <br /> Suite 9E <br /> Everett, WA 98201 <br /> The RFFP Proposal submittal must include the following: <br /> • One original unbound, clipped 8 1/2"x11" hardcopy and five (5) bound hard copies. <br /> • One electronic copy of the RFFP Proposal (in PDF format) containing the <br /> information listed in RFFP Section 5 must be uploaded to the following FTP site: <br /> https://ftp.everettwa.qov/?ShareToken=DBE151 DF7C6D2D6C6EFC99F79FA594 <br /> BBB79D8C13 <br /> • Note: The Owner cannot accept responses via electronic media (i.e., flash drives, <br /> CDs, etc.), fax or e-mail. RFP Proposals (hardcopy and electronic copy) in <br /> response to the RFP must be received by no later than the time and date identified <br /> in RFP Section 2.2 unless modified by addendum. <br /> The Owner will record the date and time of receipt of the submittal as evidence of the <br /> actual receipt of the RFFP Proposal. <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 00 22 13 <br /> Improvements 00 22 13-4 RFFP for GCCM Services <br /> RFFP for GC/CM Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.