3.1.2 Key personnel listed above shall be the same as shown in the shortlisted Proposer's RFP <br /> Proposal and shall be committed to this Project at the required levels throughout the pre- <br /> construction and construction phases. Should a staff member listed above need to be <br /> replaced for reasons out of the GC/CM's control or the level of staffing required change <br /> during the Project, the Owner and selected GC/CM will negotiate changes to the Specified <br /> General Conditions sum within any component (phase) of the Project. The monthly rates <br /> listed in the RFFP Final Proposal will be used as a basis for compensation to the GC/CM <br /> when negotiating Amendments to the GC/CM Contract. The Owner reserves the right to <br /> review qualifications and experience of individuals proposed to replace key personnel <br /> listed above and further, to reject proposed changes to key personnel listed above on the <br /> basis of qualifications and experience relative to that of the original staff member being <br /> replaced.The Owner reserves the right to terminate the contract, for cause, if a personnel <br /> replacement acceptable to The Owner cannot be negotiated. <br /> 3.2 Proposer shall comply with the following instructions in preparing its RFFP Final Proposal. <br /> 3.2.1 In the RFFP Final Proposal Form, Proposer shall enter the monthly rate dollar amount for <br /> each Project Staff Position listed on the RFFP Final Proposal Form and multiply it by the <br /> number of months to arrive at the Total Cost for each position over the duration of the <br /> Project. The Total Costs for all positions shall be totaled together with the line identifying <br /> "All Other SGC Costs Required in the Contract Documents" such that the "Total SGC <br /> Cost" in Column C on the RFFP Final Proposal Form equals the bid amount for SGC <br /> Work. (Note that, per 3.1.1 above, some Staff positions are required to be full time, <br /> committed to this project only. Others, at contractor's discretion, do not have to have to <br /> be full time and fully committed to this Project.) <br /> 3.2.2 In the RFFP Final Proposal Form, Proposer shall enter the percentage for the Fee <br /> calculation, and multiply it by the estimate of the Maximum Allowable Construction Cost <br /> (MACC) stated on the RFFP Final Proposal Form to determine a single dollar amount for <br /> the Fee. (Note that the MACC for purposes of calculating the GC/CM Fee does not include <br /> Negotiated Support Services, Specified General Conditions, Construction Managers <br /> Contingency(Risk Contingency), Owners Contingencies, Pre-Construction Services Fees <br /> or WA State Sales Tax.) The dollar amount for the Fee will be added to Total SGC Cost <br /> to determine a single amount, which shall be the Proposer's Total Bid for the Project. <br /> 3.2.3 The Proposer's business name, address, other contact information, Contractor's <br /> Registration Number, UBI Number, and Employment Security Department number of the <br /> Proposer shall be typed or printed on the RFFP Final Proposal Form in the space provided. <br /> 3.2.4 RFFP Final Proposals must be (1) submitted on the RFFP Final Proposal Form furnished <br /> by Owner or a copy of this form, and (2) manually signed in ink by an authorized <br /> representative of the Proposer. <br /> 3.2.5 Proposers shall submit bids on the RFFP Final Proposal Form. Only the amounts and <br /> information required on the RFFP Final Proposal Form furnished by the Owner will be <br /> considered as the RFFP Final Proposal. All blanks must be completed and, if left blank, it <br /> will be assumed that the cost is included in either the Fee or the All Other SGC Costs <br /> category and will not be separately reimbursable. <br /> 3.2.6 Receipt of all addenda must be acknowledged by identifying the addendum number in the <br /> space provided in the RFFP Final Proposal Form. <br /> 3.2.7 Neither a bid bond nor a letter from surety will be required as part of this procurement <br /> process. <br /> City of Everett Municipal Building February 3,2023 <br /> Everett Municipal Building Public Works Tenant Spec Sect 00 22 13 <br /> Improvements <br /> 00 22 13-3 RFFP for GCCM Services <br /> RFFP for GC/CM Services <br />