BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
maximum allowable compensation for GC/CM preconstruction services for the purposes of the <br /> GC/CM Contract. The GC/CM preconstruction services are to be billed at an hourly rate and, <br /> without prior written approval of the Owner, shall not exceed the total maximum compensation for <br /> preconstruction services agreed to in the final Work Plan and identified in the GC/CM Contract. <br /> Subject to approval of the final Work Plans by the Owner, and approval by the Everett City <br /> Council, the Owner and Contractor shall execute the GC/CM Contract, as included in draft form <br /> in this RFFP. <br /> If the final Work Plan received is not satisfactory, the Owner will advise the Contractor of the <br /> shortcomings and request additional revisions to the final Work Plan. If a final Work Plan and <br /> GC/CM Contract, acceptable to and approved by the Owner, is not able to be reached within 21 <br /> calendar days or such longer time as the Owner may determine in the Owner's sole discretion <br /> following notification of the Contractor's selection for negotiation of preconstruction services and <br /> a GC/CM Contract, the Owner reserves the right to terminate negotiations with the Contractor <br /> and, at its discretion, begin discussions with the next highest ranked Proposer. <br /> 10. GMP Negotiations and Guaranteed Maximum Price Amendment <br /> This Section 9 is a preliminary summary of the GMP negotiations. However,the GMP negotiations <br /> are exclusively governed by executed GC/CM Contract. <br /> GMP negotiations are expected to occur, pursuant to the GC/CM Contract,when the scope of the <br /> Project and/or phases are adequately defined and the Construction Documents are at least ninety <br /> percent (90%) complete, as mutually determined by the GC/CM and the Owner, but no later than <br /> the completion of the Construction Documents. <br /> The Owner may also, with the assistance of the GC/CM, opt to conduct a series of negotiations <br /> for selected, smaller, defined bid packages prior to the final GMP Amendment whereby each <br /> negotiation will culminate in determination of a defined portion of the Work and a price for that <br /> Work. <br /> At the time that the scope and price of the Work, is successfully negotiated,the parties will execute <br /> a GMP Amendment to the GC/CM Contract. At the time that a final GMP is successfully <br /> negotiated, the parties will sign a final GMP Amendment which will supersede and include all <br /> previous GMP Amendments. Each GMP Amendment must be approved by the Everett City <br /> Council before the City can sign it. <br /> Should the GC/CM and Owner not agree on a GMP the Owner may, at their sole discretion, opt <br /> to cancel the negotiations and begin negotiations with the next highest ranked Proposer or may <br /> opt to bid the Project, or take any other action consistent with applicable law. The GC/CM shall <br /> not be reimbursed for the GMP negotiations. <br /> 11. RFFP Final Proposal Bid Amounts <br /> 11.1 After RFFP Final Proposals have been opened and the bid amounts read, the calculation <br /> of the Fee bid amount will be checked for correctness. A discrepancy between the Fee <br /> percentage and the Fee bid amount shall be resolved by accepting the Fee percentage <br /> as correct and making any necessary adjustment in the Fee bid amount. The Owner shall <br /> mathematically correct, where necessary, the summation of the Total Bid amount. <br /> 11.2 The Proposer's Total SGC Cost amount and Fee Percentage as included on the RFFP <br /> Final Proposal Form shall be valid until execution of the GC/CM Contract, and the Total <br /> SGC Cost amount and Fee Percentage shall be included in the calculation of the GMP. <br /> February 3,2023 <br /> City of Everett Municipal Building Spec Seat 00 22 3 <br /> Everett Municipal Building Public Works Tenant RFFP for GCCM Services <br /> 13 <br /> Improvements 00 22 13-7 <br /> RFFP for GC/CM Services <br />