BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item/Task Document Reference Precon. Const. Specified Cost of Negotiated Const. Owner <br /> Services Cost Manager's General Work/MACC Support Manager's <br /> Fee Conditions Services Contingency <br /> In order to assist the GC/CM proposers in developing the cost associated with the segments of the fee proposals process and how costs are intended to be treated under the Contract Documents,the Owner is providing the <br /> following Cost Responsibility Matrix(CRM).The shaded and checked box indicates in what section the Owner expects the GC/CM proposer to apply the identified costs.This list is not intended to be a complete list of activities and <br /> costs required to complete the project,but a guide outline.Proposers should refer to the Request for Final Proposals(RFFP)along with the Contract Documents(Agreement&General Conditions),including all addenda,to <br /> ascertain all of the full project scope requirements.In the event there is conflict or omitted items contained in the CRM,the Contract Documents shall govern.Note that there are some items listed in the CRM that are not <br /> specifically addressed in the RFFP or Contract Documents but have been added to this CRM to clarify scope.These clarified scope items shall be included in the scope of services. <br /> Costs of reproduction,telegrams,facsimilies,long-distance phone calls, <br /> postage,express delivery charges,telephone at the site and reasonable petty A133-7.9.1.15 X <br /> cash expenses of the on-site office. <br /> Legal,consultant or claims-related costs. A133-7.9.1.16 X <br /> Business licenses. A133-7.9.1.18 X <br /> Correction of Work rejected or deemed nonconforming to the requirements N/A X <br /> of the Contract Documents,including retesting and inspections. <br /> GC/CM's costs related to mediation related to claims,disputes or other N/A X <br /> matters. <br /> Specified General Conditions(Definition) A133-2.0.37 X <br /> GC/CM management of Negotiated Support Services. A133-2.0.25 X <br /> GC/CM construction administration,management services and supervision A133-2.0.37 X <br /> of the project. <br /> All costs,except bid document reproduction and advertisement,associated <br /> with subcontractor pre-bid eligibility,subcontractor bidding,subcontractor A133-2.0.37&3.1.12.2 X <br /> buyout and subcontract award and execution after the GMP. <br /> All aspects of safety,and/or the project safety plan,implementation and A133-2.0.37 and 7.9.1.13 X <br /> administration. <br /> Any cost that is not specifically identified as a Reimbursable Cost of the A133-2.0.37 X <br /> Work,a Negotiated Support Service or as covered by the Fee.All bonds and insurance,except builders risk,required by A201-Section 11 A133-2.0.37 X <br /> and bonding of subcontractors with contract value<$300K. ' <br /> Develop,submit,monitor,report and update Construction Schedule after A133-3.3.2.4&A201-3.10 X <br /> GMP. <br /> Daily logs documenting construction activities,weather, <br /> subcontractors/workers on site,equipment on site,deliveries,safety/injury A133-3.3.6 X <br /> information,photos and other information. <br /> Maintain record copy of all subcontracts,purchase orders,record drawings <br /> and specifications,addenda,change orders,shop drawings,product data, A133-3.3.2.8&3.11 X <br /> samples,submittals,inspection reports,applicable handbooks,O&M <br /> manuals and instructions. <br /> Page 3 RHS Draft Cost Resp Matrix 12-14-21.xlsx <br />