My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BNBuilders Inc. 6/14/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
BNBuilders Inc. 6/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:29:42 PM
Creation date
6/16/2023 1:44:06 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
BNBuilders Inc.
Approval Date
6/14/2023
Council Approval Date
5/10/2023
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Everett Municipal Building - Public Works Tenant Improvements Preconstruction Services
Tracking Number
0003791
Total Compensation
$237,982.96
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
BN Builders, Inc. 12/15/2024 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2025
BNBuilders 4/5/2024 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
BNBuilders Inc. 12/18/2023 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
BNBuilders Inc. 6/7/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item/Task Document Reference Precon. Const. Specified Cost of Negotiated Const. Owner <br /> Services Cost Manager's General Work/MACC Support Manager's <br /> Fee Conditions Services Contingency <br /> In order to assist the GC/CM proposers in developing the cost associated with the segments of the fee proposals process and how costs are intended to be treated under the Contract Documents,the Owner is providing the <br /> following Cost Responsibility Matrix(CRM).The shaded and checked box indicates in what section the Owner expects the GC/CM proposer to apply the identified costs.This list is not intended to be a complete list of activities and <br /> costs required to complete the project,but a guide outline.Proposers should refer to the Request for Final Proposals(RFFP)along with the Contract Documents(Agreement&General Conditions),including all addenda,to <br /> ascertain all of the full project scope requirements.In the event there Is conflict or omitted items contained In the CRM,the Contract Documents shall govern.Note that there are some items listed in the CRM that are not <br /> specifically addressed in the RFFP or Contract Documents but have been added to this CRM to clarify scope.These clarified scope items shall be included In the scope of services. <br /> Testing,intrusive Investigation,selective demolition and restoration during N/A X <br /> design,when pre-approved by Owner. <br /> Submit information as required to CPARB,prior to GMP. A133-14.4 X <br /> Udating and/or modifying of building information models supplied by N/A X <br /> Owner/Architect for cost estimating purposes. <br /> Advise/recommend on early procurement and/or early bid packages and <br /> provide planning,assembly,advertising,pre-bid conference,bidding,and N/A X <br /> associated GMP Amendment/Mini-MACC. <br /> Construction Manager's Fee(Definition) A133-2.0.19 X <br /> GCCM profit and all overhead expenses not otherwise reimbursable under <br /> A133-2.0.19 X <br /> Contract Documents. <br /> Overhead and other expenses of the GCCM's home office and offices other A133-2.0.19 X <br /> than the on-site office. <br /> All taxes(use,B&O,income,etc.),except State and local sales tax. A133-2.0.19 X <br /> Preparation and negotiation of Guaranteed Maximum Price proposal and the N/A X <br /> final Guaranteed Maximum Price Amendment. <br /> Costs above the Guaranteed Maximum Price,other than costs approved by A133-6.2 X <br /> Owner in a Change Order. <br /> Salaries and other compensation of GC/CM personnel not stationed at the A133-7.9.1.1 X <br /> on-site office. <br /> Bonuses,Profit Sharing,Incentive Compensation and other Discretionary N/A X <br /> Payments. <br /> GCCM's capital expenses. A133-7.9.1.4 X <br /> Costs due to the negligence of or failure to fullfill a specific responsibility of <br /> the contract by the GC/CM,subcontractors of any tier,supplier or anyone A133-7.9.1.5 X <br /> employed by any of them. <br /> Overtime wages not pre-approved by Owner. A133-7.9.1.10 X <br /> Main office,home office or on-site office accounting related or data A133-7.9.1.11 X <br /> processing related,software,hardware or computer related costs. <br /> Penalties and fines imposed by a Governmental entity. A133-7.9.1.12 X <br /> Liquidated Damages. A133-7.9.1.14 X <br /> Page 2 RHS Draft Cost Resp Matrix 12-14-21.xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.