My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8831 CORBIN DR 2023-06-20
>
Address Records
>
CORBIN DR
>
8831
>
8831 CORBIN DR 2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 4:00:48 PM
Creation date
6/20/2023 3:49:55 PM
Metadata
Fields
Template:
Address Document
Street Name
CORBIN DR
Street Number
8831
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/y The layout shown for the main house does not match the permit history for this <br /> building. See the records available on the City of Everett website. The plans should be <br /> revised to show the changed conditions as new construction. Details for the modified <br /> walls should be provided. The modifications may affect structural bearing walls;this <br /> should be investigated. If the structural systems have been modified, structural framing <br /> plans, building sections, and details will be required. Changed conditions include but <br /> are not limited to: <br /> a. No work proposed in this application for any alteration to the main house. <br /> The rear roof and ramp on the main house, and the roof extension on the garage, do <br /> not appear to have been added with permits. These are not part of the original <br /> construction. Documentation substantiating the roofs were added with permits should <br /> be submitted for review. Alternatively,the roofs should be documented in the <br /> construction drawings as new construction. Note that the conditions of the roofs may <br /> be deteriorated and require repairs. <br /> 1. Design for roof attached to accessory building provided with application. No <br /> work proposed on the primary house in this proposal. <br /> 6. The project proposes changing the garage to a habitable building. Structural plans for <br /> the foundations, walls, and roof are required to substantiate that the building complies <br /> with the construction requirements of the IRC. The location and construction of the <br /> braced walls should be specified;the walls should be provided with anchorage to the <br /> foundations. If roof trusses are present, documentation substantiating that they have <br /> sufficient capacity for design loads under the current code should be submitted for <br /> review. <br /> 1. Notes added to plans to ensure existing conditions comply with current building <br /> code with alternative measures for compliance during inspection if conditions do <br /> not comply. Notes for braced walls, rafter ties, hold-downs and other lateral <br /> systems provided as requested. Analysis of existing trusses provided. <br /> _T. he new AFH is required to meet the insulation requirements of the WSEC-15, including <br /> but not limited to: <br /> a. No new AFH is proposed. Notes added for ADU to comply with WSEC-2015 <br /> "v. The new AFH is required to meeting the energy credit requirements of WSEC-15 Section <br /> R406. The selected credits should be listed in the drawings. <br /> 1. No new AFH. Notes added to ensure new ADU complies with WSEC-2015 energy <br /> credits <br /> 'Dimensions are required for the bathrooms. <br /> 1. Dimensions for all walls are provided. <br /> Grab bars are required for the toilets and bathtub. <br /> MIpage 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.