Laserfiche WebLink
Lighting, Motor and Electrical Requirements List, pg 8 of 10 <br /> 2018 WSEC Requirements for Commercial Buildings including Group R2,R3&R4 over 3 stories&all R1-- Administered by©2022 NEEA,All rights reserved <br /> • The following information is necessary to check a permit application for compliance with the lighting systems,motors and electrical system requirements in the <br /> Washington State Energy Code,Commercial Provisions. <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport©waenergycodes.com <br /> C503.6.3 Lighting panel Where a new interior and/or exterior lighting <br /> alterations panel is installed or an existing panel is moved <br /> (all new raceway and conductor wiring), <br /> indicate all applicable lighting controls <br /> requirements apply <br /> C503.6.4 Newly-created rooms Where interior space(s)is reconfigured <br /> (permanently installed walls or ceiling-height <br /> partitions)to create new enclosed spaces, <br /> indicate all applicable lighting controls <br /> requirements apply <br /> YES C504.2 Lighting repairs Identify existing luminaires being upgraded Elec Sheets <br /> with bulb and/or ballast replacement; <br /> indicate fixture alteration does not increase <br /> existing fixture wattage <br /> NA C505.1 Change of interior Identify spaces on plans where the building <br /> space use area type or space use type is being changed <br /> from one type to another per Tables <br /> C405.4.2(1)or(2) <br /> YES Indicate compliance method(building area or WSEC Reports <br /> space-by-space);include all new and existing- <br /> to-remain luminaires in WSEC interior <br /> lighting compliance reports;indicate proposed <br /> lighting wattage does not exceed maximum <br /> allowed per compliance path <br /> RECEPTACLES <br /> C405.l0 Controlled Identify all controlled and uncontrolled <br /> receptacles receptacles on electrical plans in each space in <br /> which they are required;include receptacle <br /> configuration such as spacing between <br /> controlled and uncontrolled,duplex devices, <br /> etc <br /> Provide schedule that lists the number of <br /> controlled and uncontrolled receptacles in <br /> each space where controlled receptacles are <br /> required-classrooms,private offices,open <br /> office au•cas,conference rooms,copy rooms, <br /> break rooms and modular <br /> partitions/workstations <br /> Indicate on plans the method or automatic <br /> control for each controlled receptacle zone <br /> (occupant sensor or programmable time-of- <br /> day control);indicate that each zone served by <br /> a single controller does not exceed 5,000 sf <br /> C405.2.5, Switched receptacles Indicate method of automatic off control of <br /> Item 2 in sleeping units all switched receptacles in sleeping units <br /> (vacancy or key card control) <br /> C503.6.6 Electrical receptacle Where new receptacles are added or replaced <br /> alerations within an alteration project that is 5,000 sf or <br /> larger,indicate receptacles are provided with <br /> automatic controls per C405.10.or exception <br /> taken <br /> MOTORS,TRANSFORMERS,ELECTRIC METERS,INTERIOR TRANSPORTATION <br /> Page 8/10 ) <br />