Laserfiche WebLink
• • <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHI NGTON <br /> August 26, 2019 <br /> Mr. Art Skotdal <br /> Skotdal Real Estate <br /> 2707 Colby Avenue, Suite 1200 <br /> Everett, WA 98201 <br /> Email Address: art@skotdal.com <br /> RE: Owner: North County Properties, LLC <br /> Job Address: 2721 Wetmore Avenue <br /> Plan Check Number: - 5, First Building Review - Structural <br /> Dear Mr. Skotdal, 31106- o3 G <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments primarily address structural <br /> issues. Several supplemental non-structural comments are also included in this review; the primary <br /> non-structural review has been issued separately. Additional revisions or additions may be required <br /> by other departments including Public Works, Planning, and Fire. <br /> Code citations provided in the following comments reference the 2015 International Building Code <br /> (IBC), the 2015 International Existing Building Code (IEBC), the 2015 International Property <br /> Maintenance Code (IPMC), the 2015 International Fire Code (IFC), the 2015 International <br /> Mechanical Code (IMC), and the 2015 International Energy Conservation (IECC), and the 2015 <br /> Washington State Energy Code (WSEC). The current IBC referenced standard for accessible design <br /> is the 2009"Accessible and Usable Buildings and Facilities"(ICC/ANSI A117.1). Federal ADA, FHA, <br /> and HUD regulations and standards, including the Fair Housing Accessibility Guidelines, may be <br /> more restrictive. References to other design standards include the current edition. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. One copy of supplemental structural calculations. <br /> d. Report of supplemental geotechnical criteria. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> (Page 1 of 12 <br />