Mr. Art Skotdal <br /> Skotdal Real Estate <br /> Plan Check Number: B1906-031, First Building Review - Structural <br /> August 26, 2019 <br /> 21.The Level P0, P1 and 1 PT-slabs appear to require pours strips. See the north-south tendons <br /> between Grids A-E/1-8 as an example. The plans shall be revised to specify pour strips where <br /> required. Details for the pour strip construction shall be included in the construction drawings. <br /> See IBC Sections 107.2.1 and 1603.1. <br /> 22.The Level P1 plan on Sheet 52.01 shows stud rail reinforcement at the supports. The <br /> reinforcement requirements are not specified. See Sheet S2.03 for representative <br /> reinforcement specifications. Stud rail reinforcement specifications shall be provided on Sheet <br /> S2.01. See IBC Section 1901.5 Item 3. <br /> 23.The design of the Level 1 slab is shown on Sheets S2.06, 2.07, and A-2.2a. See IBC Section <br /> 107.2.1, 1603.1, and 1604.1. The following comments shall be addressed: <br /> a. Sheet S2.06 appears to show an 8-inch thick depressed slab area between Grids A-B.3 with <br /> a uniform 6-inch step down from east to west. However, Sheet A-2.2a shows typically <br /> shows a 4-inch step, except between Grids 6.4-8 where the step is 3-inches. The drawings <br /> shall be revised for consistency. <br /> b. Continuing with the previous comment, the structural calculations have been performed <br /> considering a 6-inch step. The design shall be revised as needed pending the determination <br /> of the correct step heights. <br /> 24.The L1 slab on Sheet S2.07 includes transfer beams at Grids 5.3/A-D and 7/A-D, identified as <br /> CB36x30 and CB 36x36, respectively. The project also includes additional beams CB18x40.5 at <br /> Grid 6.4/D-F on Sheet S2.07 and CB22x16 at Grid 4/G-H on Sheet S2.04. Calculations <br /> substantiating the beam design shall be submitted for review. The design shall consider the <br /> load combinations per ASCE 7-10 Section 12.4.2.3 including the vertical seismic load effects per <br /> Section 12.4.2.2. Details for the beams, including the end connections to the supports and the <br /> required reinforcement, shall be included in the structural drawings. Additional review <br /> comments may be provided pending review of the design. See IBC Section 1604.1 and 1901.5 <br /> Item 3. <br /> 25. Continuing with the previous comment, an additional transfer beam appears intended at Grid <br /> 6.4/A-D, though one is not clearly shown. Section 1/S6.02 is referenced along the slab step <br /> east of Grid D; the section shows an outline for the same beam provided on Grids 5.3 and 7. <br /> Verify that a beam is provided as this location and revise the plan as required. Calculations <br /> substantiating the beam design shall be submitted for review. The design shall consider the <br /> load combinations per ASCE 7-10 Section 12.4.2.3 including the vertical seismic load effects per <br /> Section 12.4.2.2. Additional review comments may be provided pending review of the design. <br /> See IBC Section 1604.1. <br /> 26.The design of the Level 2 slab is shown on Sheets S2.08, 2.09, and A-2.3a. See IBC Section <br /> 107.2.1, 1603.1, 1604.1, and 1901.5 Item 3. The following comments shall be addressed: <br /> a. Sheet S2.06 specifies a 14-inch thick slab of uniform elevation for the entire floor. <br /> However, Sheet A-2.3 a slab of unspecified thickness with 3-inch depressions distributed <br /> throughout the floor. The drawings shall be revised for consistency. <br /> O3200 Cedar Street © 425.257.8810 CD everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page7� of1Z/� <br />