My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 11:11:14 AM
Creation date
6/22/2023 9:57:45 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Mr. Art Skotdal <br /> Skotdal Real Estate <br /> Plan Check Number: B1906-031, First Building Review - Structural <br /> August 26, 2019 <br /> c. The building structural components (i.e., elevator shaft wall studs and supporting floor <br /> framing) that support the elevator system are included in the submittal drawings. <br /> Calculations substantiating the design of the structure to support the elevator loads <br /> concurrently with other loads (e.g., concurrent stud flexural and axial loading) shall be <br /> submitted for review. The calculations should include the evaluation of deflection limits per <br /> IBC Section 1607.9.1. The design shall consider concurrent multi-directional loading as <br /> determined by the elevator manufacturer. See IBC Sections 1604.2 and 1605. <br /> d. The connections between the elevator guide rails and the structural framing are typically the <br /> responsibility of the engineer-of-record for the building system. Calculations substantiating <br /> the connections to the structural framing shall be submitted for review. The design shall <br /> consider concurrent multi-directional loading as determined by the elevator manufacturer. <br /> The required locations and maximum spacing for the connection points should be specified <br /> in the structural drawings. See IBC Section 107.2.1 and 1604.4. <br /> e. The structural calculations shall be performing using the appropriate load combinations <br /> including live and seismic loading per IBC Section 1605. In addition, documentation shall be <br /> submitted verifying the nominal loads have been increased for impact effects per IBC <br /> Section 1607.9.1. <br /> f. The elevator shaft extends through five stories of wood-framed structure. Calculations <br /> substantiating that shrinkage of the structure will not adversely affect the performance of <br /> the elevator shall be submitted for review. Elevator rails should be evaluated for induced <br /> axial loads or provided with connections that allow for vertical differential movement. See <br /> IBC Section 2304.3.3. <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Drew Martin, P.E., S.E. <br /> Associate Engineer/ Commercial Plans Examiner <br /> (425)257-8813 <br /> dmartin@everettwa.gov <br /> S:\B M a rti n\2019\B 1906-031_R 1-STR.d ocx <br /> O3200 Cedar Street © 425.257.8810 0 everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> ( E1of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.