My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 11:11:14 AM
Creation date
6/22/2023 9:57:45 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Plan Check Number PW1907-055 <br /> 2721 Wetmore Avenue <br /> Response to comments from First Building Review,August 26, 2019 <br /> Item 23 <br /> The L1 planter/terrace areas west of grid B.5 account for a 4"step and 2"slope to drain. <br /> Items 24-25 <br /> See Section A, Part 3.4 of the Supplemental Structural Calculations <br /> Item 26 <br /> The L2 slab has been clarified as a 14"slab, and account for 3"step and slope to drain for the <br /> planter/terrace areas on the east side of the units. Reference elevations are noted on sheet S2.08. Live <br /> loads have been reduced appropriately and input into the slab analysis as unreducible. Snow loads <br /> have been conservatively input as an unreducible live load. Seismic loading and load combinations per <br /> ASCE 7-10 section 12.14.3.2 with exception noted have been included. Reference updated slab <br /> calculations. <br /> Item 27 <br /> The L2 balconies are intended to be vendor designed deferred submittal items. Concrete slab edge and <br /> calculations have been updated accordingly. <br /> Item 28 <br /> Plans have been revised to show where beams FB-5 are continuous. Detail 2/S9.01 has been revised <br /> for clarification. <br /> Item 29 <br /> The beam call-outs have been corrected. Beam Type FB-3 has been incorporated at HR-1 <br /> Item 30 <br /> This has been specified on plans as HR-1. <br /> Item 31 -32 <br /> See Section C, Part C1 of the Supplemental Structural Calculations <br /> Item 33 <br /> See framing note#15 on sheets S2.11 through S2.15. <br /> Item 34 <br /> Please see the supplemental calculation.The drift snow load is calculated to be 25.8 psf which is 0.8 psf <br /> more than what we specified for flat roof snow load on sheet S1.01. However, no revision to the roof <br /> framing is needed because the roof framing is same as floor framing which means it has the capacity to <br /> carry a minimum live load of 40 psf. <br /> Item 35 <br /> The roof framing is same as floor framing which means it has the capacity to carry a minimum live load <br /> of 40 psf. <br /> Structural/Lateral System: <br /> Item 36 <br /> The lateral analysis is based on the Equivalent Lateral Force procedure per Section 12.8. <br /> Item 36.a <br /> We use model overlays to verify that the analytic model is consistent with the Revit model we use for the <br /> drawings. While not 100%congruent,the analytic model accurately reflects the Revit model <br /> dimensionally. <br /> Ez ) <br /> S <br />
The URL can be used to link to this page
Your browser does not support the video tag.