Laserfiche WebLink
• • . <br /> Mr. Art Skotdal <br /> Skotdal Real Estate <br /> Plan Check Number: B1906-031, Second Building Review-Structural <br /> October 18, 2019 <br /> consistent with the plans (e.g., "PO"vs"P1a, "P10"and "Foundation"vs"P2", etc.). One <br /> section shows a continuous floor versus the floor opening shown on Sheet S2.01. <br /> g. Detail 16/S6.00 includes a section that is not referenced in the general wall elevation. <br /> h. The columns on Grids D and H/6 at Level P1 per Sheet S2.01, and Grids F, G, and H at <br /> Level 1 on Sheet S2.06, appear to be shifting at floor line. This may occur at other locations <br /> and on other levels. The design shall be reviewed and revised as needed. <br /> i. Multiple columns have been rotated at the floor lines. The slab shear stud reinforcement <br /> has been oriented with the columns above instead of the column below. See Grid H/3 at <br /> the Level 2 slab on Sheet S2.06 as an example. The shear stud reinforcement shall be <br /> reviewed for all columns and revised as needed to provide the correct orientation. <br /> 8. This comment has not been completely addressed. The original comment stated that the <br /> thicknesses of the concrete walls throughout the building were not clearly defined. See IBC <br /> Sections 107.2.1 and 1603.1. The following comments shall be addressed: <br /> a. Foundation Note 5 on Sheet S2.00 specifies the typical wall thickness as 8 inches. The <br /> project does not appear to include any 8-inch walls, while 10-inch walls appear to be the <br /> typical condition. The note shall be revised. <br /> b. The wall at Grid D/1-2 on Sheet S2.00 has been reduced to 14 inches thick. However, the <br /> wall is specified as a 10-inch wall on architectural Sheets A-2.0 and A-9.0. The drawings <br /> shall be coordinated. The structural design shall be revised and supplemental calculations <br /> substantiated the design of the wall shall be submitted for review as needed. <br /> 9. No additional comment. <br /> 10. No additional comment. <br /> 11.This comment has not been completely addressed. Sheet S2.16 provides a framing plan for a <br /> roof penthouse. The plan has been revised but remains incomplete. See IBC Sections 1603.1 <br /> and 1604.1. The following comments shall be addressed: <br /> a. The gravity framing shall be specified. <br /> b. Diaphragm sheathing shall be specified. <br /> c. Shear walls shall be specified. <br /> d. Connection details between the roof and walls, and between the walls and roof below, shall <br /> be specified. <br /> e. Calculations shall be provided to substantiate the design. <br /> Foundation System: <br /> 12.This comment has not been completely addressed. The original comment addressed the design <br /> of the perimeter wall foundations. The Foundation Schedule on Sheet S2.00 specifies 2-foot <br /> wide footings with longitudinal reinforcement. The thickness and transverse reinforcement are <br /> not specified. This information is not provided in the building sections. See IBC Sections <br /> 1603.1 and 1901.5 Item 3. <br /> O3200 Cedar Street © 425.257.8810 ED everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/per s <br /> Page 4 of 11 <br />