My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 11:11:14 AM
Creation date
6/22/2023 9:57:45 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AdditionalOctober 20Mr. Art SkotdaCol <br /> Skotdal Real Estate <br /> Plan Check Numbemments:r: B1906-031, Second Building Review - Structural <br /> 1 <br /> 43.The wood-framed building has been evaluated and loads distributed using a flexible diaphragm <br /> assumption. However, the buildingis an open-front structure in both directions, with <br /> p p <br /> diaphragms exceeding six feet. Note that the shear walls on Grids 1.2/G-G.9 and 7.8/G.5-H.2 <br /> are located at the east ends of the diaphragms and do not have effectively load paths for the <br /> full diaphragm width, resulting in long diaphragm cantilevers to the walls on Grids 2.2/B.7-D.7 <br /> and 7.1/B.4-E.8. The design of the building shall be revised considering a rigid or semi-rigid <br /> analysis. Calculations substantiating the distribution of forces considering the relative <br /> stiffnesses of the shear walls shall be submitted for review. The calculations shall include <br /> revised documentation for the design of the shear walls, diaphragms, and holdowns. <br /> Alternatively, additional shear walls and drag framing shall be provided to eliminate the open- <br /> front conditions. See IBC Section 2306.1, and AWC SDPWS-15 Sections 4.2.5 and 4.2.5.2. <br /> 411° <br /> 44. Continuing with the previous comment, the structure shall be designed for torsional effects. <br /> Documentation evaluating the structure shall be submitted for review. See IBC Sections 1613.1 <br /> and 2306.1, ASCE 7-10 Sections 12.8.4.1, 12.8.4.2, and 12.8.4.3, and AWC SDPWS-15 Section <br /> 4.2.5.1. <br /> 45.The shear wall design appears to consider all walls as full-height wall segments per AWC <br /> SDPWS-15 Section 4.3.5.1. However, the structure appears to include walls with openings. <br /> Examples include, but are not limited to, the walls at Grids 1.2/G-G.9, 3.6/G.1-G.7, and 5.9/G.3- <br /> H.2. Supplemental documentation designing the walls as either force-transfer or perforated <br /> shear walls per Sections 4.3.5.2 and 4.3.5.3, respectively, shall be submitted for review. <br /> Alternatively, the wall design shall be revised to provide holdowns at the ends of each wall <br /> segment. See IBC Section 2306.1. <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Drew Martin, P.E., S.E. <br /> Associate Engineer/ Commercial Plans Examiner <br /> (425)257-8813 <br /> dmartin@everettwa.gov <br /> S:\BMartin\2019\B1906-031_R2-STR.docx <br /> S <br /> 3200 Cedar Street �J 425.257.8810 0 everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax CF7age 11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.