Laserfiche WebLink
S i <br /> Plan Check Number B1906-031 <br /> 2721 Wetmore Avenue <br /> Response to wood frame comments from Second Building Review,October 18, 2019 <br /> effects, as clarified in 2015 NDS SDPFWS Figure 4A(a)and (d) attached in the supplemental <br /> calculations. We confirm that diaphragm shears are within allowable limits.As requested by the <br /> reviewer, shear walls were added at the north, east and south sides of the building as shown on Sheet <br /> S2.10A. At the west side,there are no available walls to use as shear walls, so the diaphragm remains <br /> as an open sided diaphragm on the west side. Reference Figure 4A(d)with a diaphragm aspect ratio of <br /> L'/W'of 0.20:1 which is substantially less than SDPWS 4.2.5.1 limit of 1.5:1 and is acceptable.At the <br /> west end,the configuration of party walls perpendicular to the available interior shear walls supports <br /> shears in both directions account for all required torsional effects of the open ended diaphragm. North— <br /> South shears perpendicular to the party wall results in direct shears to the interior shear walls and <br /> torsional restraining shears in the long party shear walls. These torsional restraining shears are less <br /> than the controlling direct shear from the shears in the east-west direction (plane of the party walls.) <br /> Item 40 <br /> Calculations confirming the reinforced 14"thick PT slab is adequate for the applied holdown loading was <br /> submitted in previously submitted structural calculations. Reference supplemental structural concrete <br /> calculations dated November 11,2019 Pages 431 to 506 which included load combinations with code <br /> required amplified holdown loading and vertical seismic effects have been checked for punching shear <br /> and reinforcement. Reference Sheet S1.30 and S1.31 for holdown details and added reinforcement at <br /> each holdown. Please note that holdown pull-out capacity in a reinforced 14"PT slab is not a controlling <br /> failure mode when holdown forces are kept relatively small compared to larger holdown loading in <br /> thinner slabs. This is confirmed for a 14"PT slab in the attached supplemental calculations. <br /> Item 41 <br /> The reviewer has requested structural calculations for the shear wall sill plate anchorage based on <br /> concrete anchor capacity.We do not agree that the governing failure mode is anchor capacity in <br /> concrete. Anchor shear capacity is governed by the shear capacity of the anchor bolt in wood as <br /> previously submitted. Reference 2015 NDS Table 12E and Table 2.3.2 Load duration factors. <br /> Previously the copy from an earlier version of NDS was referenced but the capacities have not changed. <br /> See supplemental calculations for Table 12E and previously submitted anchor spacing calculations <br /> based on wood anchor capacity per the NDS. Concrete capacity is many times greater than the wood <br /> capacity and OK by inspection. RE footnote 3 of Table 12E which states that this table is based on <br /> concrete strength of F'c of 2500 psi or greater.When concrete strength is greater than 2500 psi, <br /> concrete is not the governing failure mode. Our PT slab concrete is specified as 5000 psi concrete so <br /> we meet this requirement. <br /> Miscellaneous <br /> Item 42 <br /> 42a. As requested the"basis of design"elevator rail loading has been added to 17/S6.02. Loading will <br /> be confirmed in forthcoming elevator submittal. Thyssen Krupp has confirmed that loading given include <br /> the effects of impact and do not need to be increased. <br /> 42b. RE Detail 16/S6.02 for the mounting plate detail at concrete levels. Loading is found on Detail <br /> 17/S6.02. <br /> 42c. RE Details on Sheet S9.01 for elevator rail mounting plates at the wood frame levels. Detail <br /> 12/S9.01 is at each floor rim. At each floor the rim blocking matches the stud depth and therefore is <br /> confirmed to be full depth. Detail 13 and 14/S9.01 occurs only at the elevator penthouse wall which is <br /> the only location where rail mounting plates attach to blocking attached to bundled studs. The <br /> attachment of the rail system to the mounting plates is by elevator manufacturer. <br /> 42d to 42f. See attached supplemental calculations confirming the supporting framing and mounting <br /> plate connections. F1 is not concurrent with F2 as the seismic is considered in one direction at a time. <br /> Elevator rail lateral loads are concurrent with gravity loading which has been considered. <br /> 42g. The requirement for accommodating 3/8"of vertical shrinkage per floor in included in all wood <br /> frame plan note#5 on each framing sheet. The attachment and detailing for accommodating wood <br /> Page 13 N <br />