Laserfiche WebLink
. • <br /> Tony Lee <br /> From: Jeff Oaklief <joaklief@j-arch.com> <br /> Sent: Wednesday, February 26, 2020 4:16 PM <br /> To: Tony Lee <br /> Cc: Art Skotdal; Craig Sanderson; Craig Skotdal;Jennifer Harris <br /> Subject: Re: FW: Marquee Apartments - revised email <br /> Hi Tony, <br /> Our responses to your checklist items are indicated in blue below. We will be generating revised sheets to issue to the <br /> contractor... but if you are willing to mark up the permit set that will save us some time. <br /> Let me know if you have any other comments or concerns. <br /> Sincerely, <br /> Jeff Oaklief <br /> Principal <br /> On Tue, Feb 25, 2020 at 6:41 PM Tony Lee<TLee@everettwa.gov>wrote: <br /> Hi Jeff— <br /> I have finished the nonstructural plan review and I have just a few comments. <br /> General <br /> I/1c.The elevator is not required to be pressurized. You don't need elevator lobbies in this building(see Section 3006.2). <br /> As this isn't a high rise or I occupancy and there is a sprinkler,you are good. We have removed the note requiring <br /> elevator pressurization. <br /> 10.The doors marked S-12 on Sheet A—3.5 are less than 24"to the windows marked S-09 and should be marked as <br /> safety glazing. <br /> We have added the notations for safety glazing to these doors and windows. <br /> Egress <br /> 1d. We need an exterior light outside of door P108 on the emergency circuit.The electrical sheets don't show that. <br /> An exterior light has been added and the electrical sheets revised. <br />