Laserfiche WebLink
• <br /> PUBLIAVORKS PERMIT Date Applied: 6/21/2019 <br /> City of Everett Permit Services <br /> Public Works Permit II: PW1906-061 <br /> EVERETT 3200 Cedar Street, 2 0 Floor Associated Bldg Permit#: B1906-031 <br /> Everett, WA 98201 Planning Reference#: SEPA12-046 <br /> WASHINGTON 425-257-8810 Public Works Fee: $7,364.19 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> NORTH COUNTY PROPERTIES LLC SKOTDAL ART <br /> 2707 COLBY AVE STE 1200 <br /> EVERETT,WA,98201 <br /> PHONE: PHONE:4252525400 <br /> TAX PARCEL ID U:00439162600800 SITE ADDRESS:2721 WETMORE AVE <br /> DESCRIPTION:SITE DEVELOPMENT FOR NEW MARQUEE APARTMENTS-77 UNITS <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated 04/28/2020. <br /> Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br /> inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be under a <br /> separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be scheduled 3-4 <br /> weeks in advance. <br /> 7.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and Construction <br /> Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 8. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to final <br /> approval/close out of the permit. <br /> 9.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrastructure shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 10.All work within this permit must be completed,Warranty Assurances in place and Performance Guarantee released before a Temporary <br /> Certificate of Occupancy will be granted. <br /> 11.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW <br /> 24-Site Final within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> 12.Submit a Performance Guarantee within 30 days of permit issuance in the form of a bond,cash deposit or assignment of funds using City provided <br /> forms.Failure to provide Performance Guarantee after 30 days shall result in"Stop Work"order being enforced on permit until Performance <br /> Guarantee is submitted and approved. <br /> Public Works Permit Fee Breakdown: <br /> Paving(953 SF) .$45.00 <br /> Grade/Fill/Excavate $36.18 <br /> PW Plan Review $509.08 /01PR �JPW Site Inspection $1,182.15 n <br /> Stormwater System Development Fee ....$5,509.78 C11 �J 202o <br /> City of Everett Official Use Only ip Op KNOWLEDc'i T OF CONDITIONS <br /> The and II • reby agrees to hold and save harmless <br /> the City of Ever 9001 claims for damages,costs,expenses,or <br /> ZQ/�� causes of action that arise because of installation and maintenance of <br /> Approved for Construction(Public Works) ate the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. <br /> FINAL INSPECTION DateWr4 <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE <br />