McDOWELL NORTHWEST, INC. ; <br /> � O <br /> 18901 East Valley Hwy S • Kent,WA 98032 f ,� <br /> (425) 251-8570 • FAX (425) 656-5939 }. <br /> July 29,2019 <br /> Skotdal Real Estate <br /> 2707 Colby Ave#1200 <br /> Everett,WA 98201 <br /> Attn: Mr.Craig Sanderson <br /> Subject: MNW JOB#3067 BUDGETARY PROPOSAL <br /> Temporary Soil Nail Walls/Vertical Elements <br /> Marquee Apartments Everett <br /> Everett,WA <br /> Craig, <br /> McDowell NW, INC. is pleased to submit this Budgetary Proposal to construct temporary soil nail walls and <br /> install vertical elements for the Marquee Apartment project located in Everett,WA. Our proposal is based on <br /> the shoring drawings and geotechnical report as described below. <br /> 1. Shoring Drawings by CT Engineering,job no. 18185,for the Marquee Apartments Everett marked <br /> permit Issue 6/14/19. <br /> 2. Geotechnical Report by Associated Earth Sciences, project no. 190169E001 dated 5/28/19. <br /> Please note that MNW has relied on the above information as being accurate irrespective of any disclaimers. <br /> This information will be made part of any contract which we may enter into. MNW is a Union Affiliated <br /> Contractor. <br /> BUDGETARY PROPOSAL CONSIDERATIONS <br /> In review of the project documents we have identified approx.7,500 SF of temporary soil nail wall shoring <br /> and 18 each vertical elements. Vertical face stability of soils is a prerequisite for soil nail wall construction. <br /> Three borings were conducted on the site which shows competent soils other than the looser material in the <br /> top few feet—we have assumed these conditions are consistent throughout the site. MNW has assumed <br /> holes can be drilled without the need of casing and that ground water won't impede drilling and shotcrete <br /> placement operations. <br /> The vertical elements are first to be installed off an access bench provided by others. The majority of the <br /> vertical elements underpin the existing structures to the North&South of the site. We have included costs <br /> for upsizing the shafts from 18"to 30". A 30"diameter shaft will give us the ability to get the beams properly <br /> aligned under the footings. We have assumed that a 6"x12"x3/4" beam cap will be welded to the beams and <br /> that 2" of non-shrink grout will fill the void between the pile cap and the footing. All vertical elements will <br /> have 2 x3 Nelson studs welded to the faces. <br /> Soil nail wall shoring will then be constructed in consecutive top/down lifts—this project has 5 lifts, a lift <br /> typically taking 1 week each. Soil nail wall shoring requires extra coordination and teamwork with the <br /> Geotechnical Construction Specialist <br /> Since 1946 <br /> / 3 <br />