My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
>
Address Records
>
WETMORE AVE
>
2721
>
MARQUEE APARTMENTS
>
2721 WETMORE AVE MARQUEE APARTMENTS 2023-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 11:11:14 AM
Creation date
6/22/2023 9:57:45 AM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
2721
Tenant Name
MARQUEE APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
544
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
excavation contractor. MNW will require support of a dedicated operator, machine and grade checker to <br /> perform neat line cutting, lap trenches,and backfill activities. <br /> The project documents call for same day closure of face cuts. MNW has priced this Budgetary Proposal to <br /> reflect same day closure of vertical face cuts. <br /> MNW will require a setup and laydown area near our work zone. This area will need to be accessible for <br /> fueling equipment and material movement. Additionally, MNW will require that a local fire hydrant be <br /> metered by others to provide a water supply to our grout plant. MNW anticipates a total duration of approx. <br /> 8 weeks to construct the shoring provided there are no interruptions of work. <br /> SCOPE OF WORK <br /> MNW will provide supervision, labor, equipment and materials necessary to complete items of work as <br /> specifically described below. This work is based on continuous uninterrupted work,working one(8) hour <br /> shift, (5) days per week with one mobilization. <br /> Mobilization—MNW will mobilize labor, equipment and materials necessary to complete our scope of work. <br /> At the completion of our work,we will promptly remove all of our equipment and any remaining <br /> construction materials from the project site. <br /> Vertical Elements—MNW will provide and install 16 each W10x19 vertical element beams into 30" diameter <br /> shafts filled with lean mix for underpinning operations and 2 each W19x19 vertical elements in 18"shafts for <br /> utility support. MNW has included cost for 3/4"x6"x12" pile caps plus 2" of non-shrink grout for underpin <br /> piles. We have included costs for the installation of%z"x 3"welded studs. <br /> Soil Nail Installation-MNW will install 292 each temporary soil nails in locations as indicated in the project <br /> plans. Anchors will be drilled approx.6" in diameter and grouted up with neat cement. We anticipate 5,100 <br /> LF of total drilling of soil nails. Anchors will be tested in accordance with the project plans and specifications. <br /> Corner Brace Installation—MNW will provide and install 1 each 6" DIA.XS pipe brace with plates and <br /> stiffeners in accordance with the project documents. <br /> Shotcrete Wall-MNW will provide and place approx. 7,500 SF of 4,000 psi temporary shotcrete wall. The <br /> temporary shotcrete wall will be 4" in thickness. We have included costs for up to an additional 4"to allow <br /> for over excavation and shotcrete rebound. Shotcrete used in excess of 185 CY(7,500 SF x 8")will be <br /> invoiced at a rate of$235/CY. Also, we have included costs associated with steel reinforcement and drain <br /> board. PVC weep drains will be installed approx. 12' o.c. at the base of the excavation. Weep drains to be <br /> hooked up by others to a permanent collection system. <br /> BUDGETARY PROPOSAL PRICING <br /> For the scope of work described above please consider a Budgetary Price of$524,250(five-hundred twenty- <br /> four thousand two hundred fifty dollars)excluding local and state sales tax. Monthly progress payments are <br /> to be paid within 15 days of close of estimate period and full payment, including retainage,shall be made <br /> within 35 days of substantial completion of our work. <br /> Geotechnical Construction Specialist <br /> Since 1946 <br /> age 2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.