Laserfiche WebLink
/ l'. <br /> Building Permit Plans Checklist, pg. 3 ENV—CHK <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2,R3,&R4 over 3 stones and all Ri Revised Oct 2017 <br /> Project Title: Marquee Apartments Date 03/14/2019 <br /> Applicability Code Location in Building <br /> (yes,no,na) Section Component Compliance information required in permit documents Documents Department Notes <br /> In single story buildings,provide list of enclosed areas that exceed 2,500 <br /> sf;for each space identify the space use.floor area.floor to ceiling height, <br /> whether skylights are installed,and any exception taken; <br /> Provide calculations for percentage of conditioned floor area located within <br /> Spaces in single a daylight zone including skylight and eligible sidelight daylight zones; <br /> C402.4.2 story buildings <br /> requiring skylights Provide calculations for percentage of skylight area in each space over <br /> 2,500 sf,OR; <br /> Provide calculations for skylight effective aperture(Equation C4-5)for <br /> each space over 2,500 sf; <br /> Indicate haze factor of skylight glazing material or diffuser <br /> ADDITIONAL EFFICIENCY PACKAGE OPTION -ENHANCED ENVELOPE PERFORMANCE <br /> To comply with additional efficiency package option,demonstrate <br /> C406.8 Enhanced envelope envelope insulation compliance via component performance;provide ENV- <br /> performance UA/ENV-SHGC compliance forms;verify that building total UA is 15% <br /> lower than the Code target UA <br /> AIR LEAKAGE <br /> Identify location and provide diagram of continuous air barrier in plans and <br /> Air barrier sections; <br /> C402.5.1.1 construction and Provide details for all joints,transitions in materials,penetrations in air <br /> sealing barrier and note method of sealing(caulked,gasketed,or other approved <br /> method) <br /> Indicate that room(s)containing non-direct vent appliances is isolated from <br /> Rooms containing conditioned space by the thermal envelope with a sealed air barrier, <br /> open combustion including doorway gasketing and sealing around ductwork and piping <br /> C402.5.3 fuel burning <br /> appliances used for penetrations; -- - <br /> space conditioning Indicate insulation provided in wall,floor and ceiling of the room envelope, <br /> and insulation required on combustion air ductwork <br /> Access openings Indicate locations of all access openings and doors to shafts,chutes, <br /> C402.5.4 and doors to shafts, stairways and elevators; <br /> chutes,stairways Indicate method of gasketing,weatherstripping and sealing of these <br /> and doors openings <br /> Indicate locations of all stairway enclosure,elevator shaft and building <br /> C402.5.5 Outdoor air intakes, pressurization relief openings,outside air intakes and exhaust openings; <br /> C403.2.4,3 exhausts and relief Note in envelope plans that all relief,outside air intake and exhaust <br /> openings openings shall be provided with dampers in accordance with Mechanical <br /> Section C403.2.4.3 <br /> Indicate method of sealing between light fixture housing and wall or ceiling; <br /> Recessed lighting in <br /> C402.5.8 building envelope Note in envelope plans that all recessed lighting fixtures shall be IC rated <br /> and have an air leakage rating not greater than 2 cfm per ASTM E283 test; <br /> include these requirements in lighting fixture schedules <br /> C402.5.6 Loading dock seals Indicate weather seal at cargo and loading dock doors <br /> Indicate locations and dimensions of vestibules and air curtains; <br /> Indicate exception and criteria utilized for all building entrances and exits <br /> C402.5.7 Vestibules <br /> that do not have a vestibule or air curtain; <br /> Indicate required performance for air curtains installed per exception 7; <br /> For unconditioned vestibules,indicate which envelope assembly(interior <br /> or exterior)complies with the requirements for a conditioned space <br /> Indicate on plans the location of air barrier boundaries and area <br /> calculations on all six sides of the air barrier; <br /> Indicate air barrier test method in accordance with ASTM E779 or <br /> approved equivalent; <br /> Indicate required maximum leakage rate for compliance. <br /> C103.2 Building air leakage <br /> C402.5.1.2 test Include the following requirements in project documents:(1)Submit air <br /> barrier test report to jurisdiction once test is completed;(2)If test results <br /> exceed 0.40 cfm/ft2(1.5 L/s*m2)at 0.3 in.wg(75 Pa),then visually inspect <br /> air barrier and seal noted sources of leakage;(3)Submit a follow-up report <br /> to jurisdiction noting corrective measures taken; (4)Include air barrier test <br /> report in compliance documentation provided to building owner. <br />