My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9512 HOLLY DR 2023-06-22
>
Address Records
>
HOLLY DR
>
9512
>
9512 HOLLY DR 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 11:42:29 AM
Creation date
6/22/2023 11:41:52 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLY DR
Street Number
9512
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> • • <br /> Response: There are no construction drawings and calculation as these are existing. They are however <br /> engineered trusses. <br /> iii) The truss design should be reviewed for conformance with the approved construction drawings and <br /> the referenced building codes, and approved for construction by the designer-of-record for the <br /> approved drawings, prior to fabrication and erection. <br /> Response:Existing truss work was completed prior to new owner purchasing the property. <br /> c. The exterior walls will require stability bracing where the wall framing is not continuous from the <br /> foundation to the roof sheathing(i.e.,the exterior walls are topped with end trusses). Details and calculations <br /> for the bracing should be submitted for review. Note that the bracing is not designed by the truss <br /> manufacturer, nor is the truss stability bracing intended to address this requirement. <br /> Response:See revised plans with pictures of actual construction. <br /> • Foundations should comply with IRC Chapter 4. Wood-framed construction on foundations should <br /> comply with Section R317.1, including clearance per Item 5. <br /> Response: See revised plans with pictures of actual construction. <br /> • Headers should comply with IRC Section R602.7. King and jamb studs should be specified for each <br /> header per Section R602.7.5. <br /> Response:See revised plans with pictures of actual construction. <br /> • Details for the construction of the new walls should be included. The details should specify connections <br /> for the top and bottom framing plates to the existing structure. See IRC Sections R106.1.1 and R301.1. <br /> Response:See revised plans with pictures of actual construction. <br /> • The building is required to have braced walls complying with IRC Section R602.10. The construction <br /> requirements of the braced walls, including anchorage to the foundations, should be included in the <br /> drawings. Note that connections to existing foundations using post-installed concrete anchors will require <br /> an engineered design. The locations of the braced walls should be specified in the plans. See IRC <br /> Section R106.1.3. <br /> Response:See revised plans with pictures of actual construction. <br /> • A general fastener schedule should be provided per IRC Table R602.3(1). Providing a reference to this <br /> table in the drawings does not satisfy this requirement. In addition, the make and model of proprietary <br /> hardware should be specified where used for connections. <br /> Response:See revised plans with pictures of actual construction. <br /> • The construction drawings should specify coating cuts, notches, and holes in preservative-treated wood <br /> with a treatment complying with AWPA M4. See Section R317.1.1 <br /> L\ \ 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.