My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 LOMBARD AVE 2023-06-22
>
Address Records
>
LOMBARD AVE
>
2215
>
2215 LOMBARD AVE 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 1:21:08 PM
Creation date
6/22/2023 1:20:28 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
2215
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> l <br /> �,, ivly '( t It • <br /> 77-''''''--._.,.. <br /> View at the Rear or East Wall - Three Piers this Wall <br /> fir' <br /> r <br /> �_ -_r <br /> -':17?'' ' F‘:47::5''''r'''7-!....'"':r'' <br /> • <br /> q ; <br /> Y�# '..*....A..:',..:' 'iAls " 1 Z i <br /> ti? let ' ` 4 <br /> *V. ay .. <br /> South Side Foundation - Three Piers at the Rear Entry Room <br /> I recommend that the south side wall shown above be supported on three (3) helical piers with <br /> three more at the rear or east vvall and one around the northeast corner of the home. These <br /> piers will use the standard foundation 4038 bracket or the modified earless RD 3177 brackets I <br /> have also shown the addition of a steel channel inside of the south and east sides of the stem <br /> wall which will allow the foundation to span between the helical piers and brackets because it is <br /> unlikely that the footing and stem wall is reinforced and able to span without bearing on the soil <br /> These piers will allow this structure lifted enough to ensure that the weight of the home is firmly <br /> on the helical piers and leveled to its maximum practical recovery, ideally about 2-inches to <br /> match the interior portion of the floor at this area. I have also shown the addition of at least two <br /> adjustable post bases to be added inside of the southeast corner and under the floor support <br /> beam where the settlement is the greatest. The locations of the piers are shown in the attached <br /> repair plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.