Laserfiche WebLink
Terra Vista NW I<< Storm water Management Report <br /> S-Onsite Stormwater Management <br /> Does the entire project qualify as Flow Control exempt(per MR#7)? <br /> Yes No <br /> Did the project developer choose to meet Does the project trigger No <br /> the LID Performance Standard? only MRs#1 -#5?(Per (the project triggers Is the project outside <br /> the Project Thresholds in MRs#1 -#9) the UGA on a parcel <br /> No Applicability of the that is 5 acres or larger? <br /> Minimum Requirements <br /> Yes T Section). <br /> REQUIRED:For each <br /> surface,consider the BMPs C-4:)s No <br /> in the order listed in List#3 <br /> for that type of surface.Use T <br /> the first BMP that is Did the project <br /> considered feasible. developer choose to <br /> Yes <br /> meet the LID <br /> NOT RUD: Performance Did the project <br /> AchievemEQentIRE of the LID Standard? developer choose to <br /> Performance Standard. No meet the LID <br /> Performance <br /> Standard? <br /> Yes Yes <br /> REQUIRED:For each <br /> surface,consider the NO <br /> BMPs in the order <br /> listed in List#1 for th <br /> type of surface.Usc <br /> the first BMP that is <br /> considered feasibly: <br /> NOT REQUIRED: <br /> Achievement of the LI' <br /> ',,r`nrmance Star'. <br /> REQUIRED:Meet the LID <br /> REQUIRED: Meet the LID Performance REQUIRED:For each Performance Standard through <br /> Standard through the use of any Flow Control surface,consider the BMPs the use of any Flow Control <br /> BMP(s)in this manual. in the order listed in List#2 BMP(s)in this manual. <br /> for that type of surface.Use <br /> REQUIRED:Apply BMP T5.13 Post the first BMP that is REQUIRED:Apply BMP T5.13 <br /> Construction Soil Quality and Depth. considered feasible. Post-Construction Soil Quality <br /> and Depth. <br /> NOT REQUIRED:Applying the BMPs in Lists NOT REQUIRED: <br /> #1,#2,or#3. Achievement of the LID NOT REQUIRED:Applying the <br /> Performance Standard. BMPs in Lists#1,#2,or#3. <br /> Flow Chart for Determining MR #5 <br /> Requirements <br /> Revised March 2019 <br /> DEPARTMENT OF <br /> ECOLOGYPlease see http.//www.ecy.wa.gov/copyright.html for copyright notice including permissions, <br /> State of Washington limitation of liability,and disclaimer. <br /> (210314)4900-3 Everett Page 6 May 19,2021 <br />