Laserfiche WebLink
/� <br /> PELLETIER SCHAAR <br /> August 13th, 2021 <br /> VECEIJME <br /> SEP 0 7 2021 <br /> Rakeeb Khan CITY OF EVERETT <br /> Residential Plans Examiner Permit Services <br /> rkhan@everettwa.gov <br /> RE: Plan Check No: B2106-047 <br /> First Building Review Architect Response <br /> Fullwiler Construction, Spec Home—4918 24th Ave West <br /> Dear Drew, <br /> NON-STRUCTURAL COMMENTS &RESPONSES: Responses in bold. <br /> 1. The referenced codes should be updated to the 2018 editions. R106.1.1. The scope-of- <br /> work(SOW)has been revised. Please see sheet"A0.1" <br /> 2. The roof eaves project approximately 3 feet from the property line in multiple <br /> locations per the site plan. In those locations, one-hour construction is required on <br /> the underside of the eaves (see alternatives and exceptions provided). In most <br /> solutions, the soffit venting will not be permitted in the eaves in these locations and <br /> the roof venting should be relocated to an approved location. Table R302.1(1). The <br /> scope of work has been revised. Please see revised roof plan,"Building Section <br /> C/A4.2" and "Detail 16/A5.1". <br /> 3. A handrail should be shown at the stairs on the floor plan in compliance with Section <br /> R311.7.8 The handrail has been added. Please see sheet A1.1 <br /> 4. A smoke alarm should be provided on the lower level and in the office. Section R314 <br /> The smoke alarm has been added to lower level and office. Please see sheet A1.1 <br /> 5. A carbon monoxide alarm should be provided on the lower level. Section R315. <br /> The carbon monoxide alarm has been added to lower level. Please see sheet A1.1 <br /> 6. The 4x4's in the crawl space should be shown as pressure treated. Section R317.1.4 <br /> A note was added. Please see framing plan S1.2 and Detail 17/A5.1 <br /> Pelletier+ Schaar, LLC <br /> 26911 98th Drive NW, Suite B, Stanwood, Washington 98292 p(360) 629-5375 <br />