My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4918 24TH AVE W 2023-06-22
>
Address Records
>
24TH AVE W
>
4918
>
4918 24TH AVE W 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 1:58:55 PM
Creation date
6/22/2023 1:52:06 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH AVE W
Street Number
4918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 i Permit Inspections <br /> VERETT City of Everett <br /> WASHINGTON <br /> 5/9/2022 5/9/2022 BLDG 03- CORRECTION <br /> KURT KECK see notes <br /> FOUNDATION WALL REQUIRED <br /> Notes: <br /> 5/9/2022 7:56 AM FULLWILER CONSTRUCTION INC <br /> Monolithic pour,ufer to be set prior. <br /> Contact Name:Ben McKinlay <br /> Site Address:4918 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> (5/9/2022 3:06 PM KMK) <br /> Rockery at east end of property is not per plan.Submit plans for review and provide all documents necessary.Please continue to work with your public <br /> works inspector regarding this.There will be no further inspections until this is cleared up.Proceed at your own risk. <br /> Note:Today I inspected the footings,foundation,and UFER ground.These are per plan. <br /> (5/9/2022 3:07 PM KMK) <br /> Rockery at east end of property is not per plan.Submit plans for review and provide all documents necessary.Please continue to work with your public <br /> works inspector regarding this.There will be no further inspections until this is cleared up.Proceed at your own risk. <br /> Note:Today I inspected the footings,foundation,and UFER ground.These are per plan. <br /> 5/26/2022 5/26/2022 BLDG 15-OTHER KURT KECK NOT REQUIRED Garage slab <br /> Notes: <br /> 5/25/2022 11:05 AM FULLWILER CONSTRUCTION INC <br /> Garage slab,will call in the AM to confirm. <br /> Contact Name:Ben McKinlay <br /> Site Address:4918 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> BLDG 05- <br /> 6/3/2022 6/3/2022 UNDERFLOOR RAKEEB KHAN APPROVAL See notes <br /> FRAMING <br /> Notes: <br /> 6/1/2022 2:48 PM FULLWILER CONSTRUCTION INC <br /> Underfloor framing <br /> Contact Name:Ben McKinlay <br /> Site Address:4918 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> (6/3/2022 3:37 PM RFK) <br /> Underfloor framing approved. <br /> Note:submit engineering and supporting documents for rockery walls prior to next inspection. <br /> 6/21/2022 6/21/2022 BLDG 07-EXTERIOR CORRECTION <br /> RAKEEB KHAN <br /> SHEAR REQUIRED <br /> Notes: <br /> Front garage wall interior requires sheathing per detail and straps. <br /> Printed:Wednesday,26 April,2023 772 of 4 E1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.