My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4918 24TH AVE W 2023-06-22
>
Address Records
>
24TH AVE W
>
4918
>
4918 24TH AVE W 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 1:58:55 PM
Creation date
6/22/2023 1:52:06 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH AVE W
Street Number
4918
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mu <br /> Permit Inspections <br /> VERETT City of Everett <br /> WASHINGTON <br /> 7/29/2022 7/29/2022 BLDG 12- KURT KECK PARTIAL Interior double shear wall <br /> INSULATION APPROVAL <br /> Notes: <br /> 7/27/2022 7:49 AM FULLWILER CONSTRUCTION INC <br /> Contact Name:Ben McKinlay <br /> Site Address:4918 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> 7/29/2022 7/29/2022 BLDG 08-FRAMING KURT KECK APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 7/27/2022 7:45 AM FULLWILER CONSTRUCTION INC <br /> Contact Name:Ben McKinlay <br /> Site Address:4918 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> 8/3/2022 8/3/2022 BLDG 12 KURT KECK APPROVAL Interior shear complete <br /> INSULATION <br /> Notes: <br /> 7/29/2022 1:16 PM FULLWILER CONSTRUCTION INC <br /> Contact Name:FULLWILER CONSTRUCTION INC <br /> Site Address:4918 24TH AVE W <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> 8/8/2022 8/8/2022 BLDG 10 DRYWALL RAKEEB KHAN APPROVAL <br /> NAILING <br /> Notes: <br /> FULLWILER CONSTRUCTION INC <br /> needed date is 8/8.Will call on Monday to confirm. <br /> Contact Name:Ben McKinlay <br /> Site Address:4918 24th Ave SE Everett,WA 98201 <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> 8/9/2022 8/9/2022 BLDG 10 DRYWALL RAKEEB KHAN CANCELLED ' rescheduled <br /> NAILING <br /> Notes: <br /> 8/5/2022 1:23 PM FULLWILER CONSTRUCTION INC <br /> needed date is 8/8.Will call on Monday to confirm. <br /> Contact Name:Ben McKinlay <br /> Site Address:4918 24th Ave SE Everett,WA 98201 <br /> Phone:4253454234 <br /> e-Mail:ben@fullwilerconstruction.com <br /> (8/8/2022 7:39 AM RFK) <br /> Called in to reschedule for 8/8/2022. <br /> b <br /> Printed:Wednesday,26 April,2023 3 of 4 ;r, <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.