Laserfiche WebLink
2021 Stormwater System Development Fee Calculations <br /> Permit#: BW2104-010 Additional Notes: <br /> Project Address: 3314 MUKILTEO BLVD Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: 1 6� i Date: 6/22/2021 <br /> Outside City Limits? No *Adds a 25%Surcharge • ! <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: C'J/�a I ` <br /> Fee Calculations: <br /> Stormwater System Development Fees: ` O <br /> 41) Permit#: BW2104-010 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces !'�`�,. <br /> Square Feet of New Plus Replaced Hard Surfaces: 81 SF v O <br /> i <br /> Stormwater System Dev Fee: $21.33 Add this fee to the Building Permit for roof area hard surfaces. ,` <br /> Stormwater System Development Fees: <br /> Permit#: PWXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br /> S <br />