My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4920 24TH AVE W Geotech Report 2023-06-22
>
Address Records
>
24TH AVE W
>
4920
>
Geotech Report
>
4920 24TH AVE W Geotech Report 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 3:02:49 PM
Creation date
6/22/2023 3:02:02 PM
Metadata
Fields
Template:
Address Document
Street Name
24TH AVE W
Street Number
4920
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoTest Services, Inc. October 8, 2021 <br /> 2405 Hillside Lane, Everett,WA Project No.21-0845 <br /> a1nmmi a■aemi <br /> For structures designed using the seismic design provisions of the International Building Code, <br /> GeoTest recommends that retaining walls include a seismic surcharge in addition to the <br /> equivalent fluid densities presented above. We recommend that a seismic surcharge of <br /> approximately 8H (where H is the height of the wall) be used for design purposes.This surcharge <br /> assumes that the wall is allowed to rotate or yield. If the wall is restrained, GeoTest should be <br /> contacted so that we can provide a revised seismic surcharge pressure. <br /> Passive earth pressures developed against the sides of building foundations, in conjunction with <br /> friction developed between the base of the footings and the supporting subgrade, will resist <br /> lateral loads transmitted from the structure to its foundation. For design purposes, the passive <br /> resistance of well-compacted fill placed against the sides of foundations is equivalent to a fluid <br /> with a density of 325 pcf.The recommended value includes a safety factor of about 1.5 and is <br /> based on the assumption that the ground surface adjacent to the structure is level in the direction <br /> of movement for a distance equal to or greater than twice the embedment depth. The <br /> recommended value also assumes drained conditions that will prevent the buildup of hydrostatic <br /> pressure in the compacted fill. Retaining walls should include a drain system constructed in <br /> general accordance with the recommendations presented in the Foundation and Site Drainage <br /> section of this report. In design computations, the upper 12 inches of passive resistance should <br /> be neglected if the soil is not covered by floor slabs or pavement. If future plans call for the <br /> removal of the soil providing resistance,the passive resistance should not be considered. <br /> An allowable coefficient of base friction of 0.35,applied to vertical dead loads only, may be used <br /> between the underlying imported granular structural fill and the base of the footing. If <br /> foundations will bear directly on the native soil, an allowable coefficient of 0.30 should be used. <br /> If passive and frictional resistance are considered together, one half the recommended passive <br /> soil resistance value should be used since larger strains are required to mobilize the passive soil <br /> resistance as compared to frictional resistance.A safety factor of about 1.5 is included in the base <br /> friction design value. GeoTest does not recommend increasing the coefficient of friction to resist <br /> seismic or wind loads. <br /> Temporary and Permanent Slopes <br /> The contractor is responsible for construction slope configurations and maintaining safe working <br /> conditions, including temporary excavation stability.All applicable local,state,and federal safety <br /> codes should be followed. All open cuts should be monitored during and after excavation for <br /> evidence of instability. If instability is detected, the contractor should flatten the side slopes or <br /> install temporary shoring. <br /> Temporary excavations in excess of 4 feet should be shored or sloped in accordance with Safety <br /> Standards for Construction Work Part N,WAC 296-155-66403. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.