Laserfiche WebLink
• • 01 <br /> prior to issuance of construction permits.A split-rail fence shall be constructed along the buffer <br /> boundary and critical area signs shall be posted on the fence in accordance with EMC 19.37.220. <br /> 2e <br /> .G/ � S .t t�. 1 icyleoz\a, <br /> Allan Giffen, Planning Director Date <br /> Appeal Process:This administrative decision may be appealed to the Hearing Examiner no later than 14 <br /> days from the day after the date of mailing of the decision. For information regarding appeals please <br /> refer to Everett Municipal Code Title 15,Chapter 24,Article IV(EMC 15.24.290—15.24.380)and contact <br /> Kelsey Heyd at 425.257.8731 or kheyd@everettwa.gov with any questions. <br /> Expiration:If a complete building permit or equivalent construction permit application has not been <br /> filed within eighteen (18) months from the approval date of this decision,the land use permit approval <br /> shall be deemed terminated, unless an extension is granted.If the permittee requests an extension in <br /> writing no later than eighteen (18)months from the land use permit approval date,the Director may <br /> grant a six(6) month extension. <br /> Information for Developer: <br /> Planning—Kelsey Heyd—425.257.8731 kheyd@everettwa.gov <br /> 1. Per EMC 19.34.110,the design of all driveways and internal vehicle circulation shall be in <br /> accordance with Title 13 and the city design standards. <br /> 2. Vehicle and equipment repair including but not limited to servicing,assembling, restoring, or <br /> modifying is subject to the requirements of EMC 19.39.160. <br /> 3. The footprint of all accessory buildings,whether attached or detached, is subject to the <br /> provisions of EMC 19.07.020.C. <br /> 4. To maintain the integrity of the critical area buffer,the principal building shall be set back a <br /> minimum of 10 feet from the edges of the critical area buffer boundaries;all other structures <br /> and improvements shall maintain a minimum setback of 5 feet from the edge of the buffer in <br /> accordance with EMC 19.37.220.B. <br /> 5. Future site work and improvements shall require compliance with EMC Title 19 including, but <br /> not limited to,the Critical Area provisions of EMC 19.37 and Parking, Loading and Access <br /> Requirements of EMC 19.34. <br /> Public Works—Sabrina Fandler—425.257.7813—sfandler@everettwa.gov <br /> 1. Construction permits, inspections and final approvals are required for this project from City of <br /> Everett Permit Services. <br /> 2. A Public Works Permit is required for this project for any site work occurring outside of the <br /> proposed building. Detailed drawings in accordance with the current City of Everett Design and <br /> Page 2 0 4 <br /> REV1119-019 <br /> EVERETT <br />