Laserfiche WebLink
I <br /> Stormwater Pollution Prevention Plan <br /> 3.1.4 Element#4—Install Sediment Controls <br /> All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal <br /> BMP before leaving the construction site. The specific BMPs to be used for controlling <br /> sediment on this project include: I <br /> • Compost Filter Berm <br /> • Silt Fence (BMB C233) <br /> • Materials on Hand (BMP C150) I <br /> The compost filter berms will be installed along the outer limits of the project site to <br /> minimize sediments from leaving the site and entering the Slough. See Appendix A for <br /> TESC Plans. <br /> Sediment will be removed from paved areas in and adjacent to construction work areas manually I <br /> or using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle tires <br /> away from the site and to minimize washoff of sediments from adjacent streets in runoff. <br /> 3.1.5 Element#5—Stabilize Soils <br /> Exposed and unworked soils shall be stabilized with the application of effective BMPs to preventI <br /> erosion throughout the life of the project. The specific BMPs for soil stabilization that shall be <br /> used on this project include: <br /> • Temporary and Permanent Seeding (BMP C123) <br /> • Mulching (BMP C121) I <br /> • Dust Control (BMP C 140) <br /> • Materials on Hand (BMP C150) <br /> • Construction Road/Parking Area Stabilization (BMP C 107) <br /> In general, cut and fill slopes will be stabilized as soon as possible. All stockpiled soils shall be <br /> stabilized from erosion, protected with sediment trapping measures, and where possible, be <br /> located away from storm drain inlets, waterways, and drainage channels. <br /> 3.1.6 Element#6—Protect Slopes <br /> All cut and fill slopes shall be designed, constructed, and protected in a manner that minimizes <br /> erosion. The specific BMPs for protection of slopes that shall be used on this project include: <br /> • Temporary and Permanent Seeding (BMP C123) <br /> SWPPP Page 6 <br /> Smith Island Terminal—Site Grading March 2017 <br />