My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3620 36TH PL NE 2023-06-22
>
Address Records
>
36TH PL NE
>
3620
>
3620 36TH PL NE 2023-06-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2023 4:26:05 PM
Creation date
6/22/2023 4:22:50 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH PL NE
Street Number
3620
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> • Mulching (BMP C121) <br /> • Materials on Hand (BMP C 150) <br /> 3.1.7 Element#7—Protect Drain Inlets <br /> The priority is to keep all access roads clean of sediment. The following inlet protection <br /> measures will be applied on this project: <br /> • Storm Drain Inlet Protection (BMP C220) <br /> 3.1.8 Element#8—Stabilize Channels and Outlets <br /> The following outlet protection measures will be applied on this project: <br /> • Outlet Protection (BMP C209) <br /> 3.1.9 Element#9 Control Pollutants <br /> Good housekeeping and preventative measures will be taken to ensure that the site will be kept <br /> clean, well-organized, and free of debris. If required, BMPs to be implemented to control <br /> specific sources of pollutants are discussed below. <br /> Vehicles, construction equipment, and/or petroleum product storage/dispensing: <br /> • All vehicles, equipment, and petroleum product storage/dispensing areas <br /> will be inspected regularly to detect any leaks or spills, and to identify <br /> maintenance needs to prevent leaks or spills. <br /> • Spill prevention measures, such as drip pans, will be used when conducting <br /> maintenance and repair of vehicles or equipment. <br /> • In order to perform emergency repairs on site, temporary plastic will be <br /> placed beneath and, if raining, over the vehicle. <br /> • Contaminated surfaces shall be cleaned immediately following any <br /> discharge or spill incident. <br /> 3.1.10 Element#10—Control Dewatering <br /> Dewatering is not anticipated during construction. <br /> 3.1.11 Element#11 —Maintain BMPs <br /> All temporary and permanent erosion and sediment control BMPs shall be maintained and <br /> repaired as needed to assure continued performance of their intended function. Maintenance and <br /> repair shall be conducted in accordance with each particular BMP's specifications. Visual <br /> SWPPP Page 7 <br /> Smith Island Terminal—Site Grading March 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.