My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
518 51ST ST SW 2023-06-23
>
Address Records
>
51ST ST SW
>
518
>
518 51ST ST SW 2023-06-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2023 4:12:42 PM
Creation date
6/23/2023 4:11:45 PM
Metadata
Fields
Template:
Address Document
Street Name
51ST ST SW
Street Number
518
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 3 of 23 <br /> PROJECT NO. SHEET NO. <br /> S201001-1XR <br /> 44\im. �� PROJECT 518 51ST ST SW, EVERETT, WA 98203 <br /> LONGITUDE SUBJECT Foundation Stabilization/Jacking <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN BY FY DATE 12/29/2020 <br /> Scope/Objective: <br /> To determine the required pile spacing and geometry to stabilize and lift(where required)the existing structural foundation. These findings <br /> have been based upon the calculated strength of the existing foundation system and the current vertical loading from the existing structure <br /> above(based on as-built assessments). <br /> The R&R Foundation Specialists'(R&R)proposed pile layout can be found in the following pages with structural recommendations based <br /> upon the findings of L120 Engineering&Design. <br /> Note that cosmetic damages to rigid wall coverings/members and siding are expected during a foundation lift. Such cosmetic <br /> damages/cracks are to be repaired by others following the completion of the foundation stabilization and lifting and are not included in the <br /> structural scope presented here. <br /> It should be further noted that L120's scope is limited to the perimeter support systems/continuous footings.The interior crawl-space <br /> support system for the first floor shall be installed per R&R. This could include the use of some or all of the following: longer support posts, <br /> adjustable post-base hardware,and/or the addition of taller wood support members. Settlement in these interior support areas shall be <br /> monitored and further adjustments shall be made if necessary. <br /> Structural Summary: <br /> -The foundation of the residence consists of continuous cast-in-place concrete stem wall and concrete strip footings.Below the footings, <br /> piles are to be spaced at a distance no larger than 8'-0"on-center at the locations indicated on the attached Level Survey. Piles to be <br /> installed in accordance with SSK-01. <br /> - End piles are to be placed as close to corners as possible and shall not exceed a max corner offset distance of 3'-0". <br /> -A maximum allowable loading of 1,360 plf was utilized in this analysis.This was determined through inspection of building geometry and <br /> conservative span/tributary loading assumptions based on standard construction practices <br /> - The following load values represent the maximum expected pile loads for the indicated spacing. R&R to provide pile and equipment <br /> assemblies with capacities equal to or greater than the indicated load values. <br /> Allowable Load Capacity Requirement: <br /> Exterior/Perimeter Piles @ 8'-0"Max 11.0 kip minimum vertical capacity(allowable load) <br /> Helical#7,#18 @ Chimney. 15.0 kip minimum vertical capacity(allowable load) <br /> Helical#6,#8 @ Chimney. 19.0 kip minimum vertical capacity(allowable load) <br /> Note: Refer to the attached General Notes for additional requirements. <br /> - As determined by R&R,the site appears to have no lateral(horizontal)displacements or concerns. As such,the analysis and <br /> recommendations presented in this report have been strictly limited to vertical stabilization/jacking. If lateral movement is observed or <br /> expected additional structural analysis will be required. <br /> Structural recommendations contained in this package are based on site photographs,dated September 30,2020,provided by R&R.To <br /> the knowledge of L120,a geotechnical investigation was not performed on this site.Consequently, all structural recommendations assume <br /> adequate soil conditions to obtain the required pile capacities. <br /> Please inform L120 of site-specific conditions that were unconsidered by, may conflict with,or otherwise compromise the <br /> recommendations contained within this package,including, but not limited to,water drainage,slope stability,existing structural damage,or <br /> existing subsurface obstructions. In this instance,the structural assumptions,recommend gr>p��n p r,tb' gt,will need to be <br /> revisited to consider and address the new findings �-' 9 f _ r t,�kz.. ►7. 1 <br /> ��'I ��°WED FOR < r:�.< '°o <br /> Refer to the following pages for pile and connection specifications. t <br /> L120 ENGINEERING&DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.