Laserfiche WebLink
• 4 of 23 <br /> GENERAL NOTES <br /> HELICAL PILES <br /> 1. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED IN ACCORDANCE WITH THE 2015 INTERNATIONAL <br /> BUILDING CODE(IBC). <br /> 2. HELICAL PILES SHALL BE DESIGNED AND MANUFACTURED BY IDEAL MANUFACTURING, INC.,AND SHALL BE IN <br /> ACCORDANCE WITH ESR-3750. <br /> 3. ALL MATERIAL PROPERTIES OF HELICAL PILE COMPONENTS SHALL BE IN ACCORDANCE WITH ESR-3750. <br /> 4. CORROSION PROTECTION OF ALL PILE COMPONENTS SHALL COMPLY WITH THE ICC-ES ACCEPTANCE CRITERIA FOR <br /> CORROSION PROTECTION OF STEEL FOUNDATION SYSTEMS USING POLYMER(EAA)COATINGS(AC228). <br /> 5. ALL HELICAL FOUNDATION COMPONENTS SHALL BE GALVANICALLY ISOLATED FROM CONCRETE REINFORCING <br /> STEEL, BUILDING STRUCTURAL STEEL, OR ANY OTHER METAL BUILDING COMPONENTS PER AC358 SECTION 3.9. <br /> 6. THE SHAFT SHALL BE DESIGNED AND FABRICATED TO SUPPORT THE SPECIFIED DESIGN LOADS. <br /> 7. ONLY MANUFACTURER-APPROVED CONNECTORS,ADAPTORS,AND ACCESSORIES MAY BE USED. <br /> 8. HELICAL PILES SHALL BE INSTALLED VERTICALLY INTO THE GROUND WITH AN ALLOWABLE ANGLE OF INCLINATION <br /> OF+/-1 DEGREE FROM VERTICAL PER SECTION 4.2.1 OF ESR-3750. <br /> 9. MONITOR AND RECORD DEPTH OF PILE PENETRATION. PROVIDE TORQUE MONITORING DEVICE AS PART OF THE <br /> INSTALLING UNIT. MONITOR AND RECORD TORQUE APPLIED DURING THE INSTALLATION OF EACH PILE AT SPECIFIC <br /> DEPTHS. <br /> 10. HELICAL PILES SHALL BE INSTALLED TO THE MINIMUM TORQUE VALUE REQUIRED TO PROVIDE THE MINIMUM <br /> REQUIRED LOAD CAPACITIES INDICATED ON PLAN INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO(2).THE <br /> MAXIMUM INSTALLATION TORQUE SHALL NOT EXCEED THE ALLOWABLE TORSIONAL CAPACITY OF ANY INDIVIDUAL <br /> COMPONENT OF THE PILE ASSEMBLY. <br /> 11. ALL BRACKETS AND HELICAL PILE ASSEMBLY COMPONENTS SHALL HAVE ADEQUATE CAPACITY TO ACHIEVE THE <br /> MINIMUM REQUIRED BEARING CAPACITY INCLUDING A FACTOR OF SAFETY NO LESS THAN TWO(2). <br /> 12. REPAIR BRACKETS MUST BE CONCENTRICALLY LOADED AND THE BRACKET PLATE MUST BE FULLY ENGAGED WITH <br /> BOTTOM OF CONCRETE FOUNDATION. <br /> 13. ALL HELICAL PILE ASSEMBLY COMPONENTS MUST HAVE ADEQUATE STRENGTH TO DEVELOP THE TORQUE <br /> REQUIRED FOR INSTALLATION AND ALL INDUCED STRESSES. <br /> 14. THE PILE QUANTITY, LAYOUT,AND SPACING INDICATED ON PLAN SHALL NOT BE CHANGED WITHOUT WRITTEN <br /> APPROVAL FROM THE ENGINEER-OF-RECORD PRIOR TO INSTALLATION. <br /> 15. CONTINUOUS SPECIAL INSPECTION IN ACCORDANCE WITH 2015 AND 2012 IBC SECTION 1705.9 MUST BE PROVIDED <br /> FOR THE INSTALLATION OF THE HELICAL PILES AND FOUNDATION BRACKETS. ITEMS TO BE RECORDED AND <br /> CONFIRMED BY THE SPECIAL INSPECTOR MUST INCLUDE THE FOLLOWING: <br /> A. PRODUCT MANUFACTURER <br /> B. MANUFACTURER'S CERTIFICATION OF THE INSTALLERS <br /> C. PRODUCT TYPE AND CONFIGURATIONS FOR HELICAL PILE LEAD SHAFT SECTIONS, EXTENSIONS, <br /> BRACKETS, BOLTS,THREADED RODS, NUTS,WASHERS,AND TORQUES AS SPECIFIED IN THIS REPORT <br /> AND THE CONSTRUCTION DOCUMENTS <br /> D. INSTALLATION PROCEDURES FOR THE HELICAL PILE SHAFT, INSTALLATION EQUIPMENT USED,AND THE <br /> IDEAL FOUNDATION SYSTEMS INSTALLATION INSTRUCTIONS <br /> E. ANTICIPATED AND ACTUAL PILING DEPTH <br /> F. REQUIRED TARGET INSTALLATION TORQUE OF PILES AND MINIMUM DEPTH OF INSTALLATION <br /> G. INCLINATION AND POSITION OF PILES,TOP OF PILE EXTENSION IN FULL CONTACT WITH BRACKET, <br /> TIGHTNESS OF ALL BOLTS AND EVIDENCE THAT THE PILE FOUNDATION SYSTEMS ARE INSTALLED BY AN <br /> APPROVED IDEAL FOUNDATION SYSTEMS INSTALLER. <br /> 16. PILES IMPROPERLY INSTALLED BECAUSE OF MISLOCATION, MISALIGNMENT, OR FAILURE TO MEET OTHER <br /> SPECIFIED DESIGN/INSTALLATION CRITERIA ARE NOT ACCEPTABLE. ABANDON REJECTED PILES AND INSTALL <br /> ADDITIONAL PILES AS REQUIRED. CITY OF E' Y,Ri d <br /> REVI,A'i'ED FOR Pr•R:IT <br /> HELICAL PILE PROOF TESTING <br /> THE CAPACITY OF THE INSTALLED PILES SHALL BE VERIFIED BY FIELD TESTING OF A MINIMUM THREE(3) PERCENT OF <br /> PILES UP TO FIVE(5) PILES MAXIMUM(ONE(1)MINIMUM) IN ACCORDANCE WITH THE PROCEDURE OUTLINED IN ASTM <br /> D1143 AND/OR THE 2015 SEATTLE BUILDING CODE(SBC).THE MAXIMUM TEST LOAD SHALL BE TWO-HUNDRED(200) <br /> PERCENT OF THE SPECIFIED DESIGN LOAD. <br />