My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1525 75TH ST SW COMCAST 2023-06-26
>
Address Records
>
75TH ST SW
>
1525
>
COMCAST
>
1525 75TH ST SW COMCAST 2023-06-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2023 8:29:04 AM
Creation date
6/26/2023 8:28:51 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1525
Tenant Name
COMCAST
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Irs <br /> CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> June 25, 2021 <br /> Mr. Tom Gaston <br /> Applied Handling NW <br /> 8825 South 184th Street <br /> Kent, WA 98031 <br /> Email Address: tomg@appliednw.com <br /> RE: Owner: Johnson Properties I, LLC <br /> Job Address: 1525 75th Street SW <br /> Plan Check Number: B2106-060, First Building Review <br /> Dear Mr. Gaston, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes <br /> adopted and amended by the state of Washington and the city of Everett. The comments below <br /> must be addressed before a permit can be issued. These comments address building issues only. <br /> Additional revisions or additions may be required by other departments including Public Works, <br /> Planning, and Fire. <br /> Code citations provided in the following comments reference the Everett Municipal Code (EMC), <br /> 2018 International Building Code (IBC) and the 2018 International Fire Code (IFC). Additional <br /> reference standards are listed in IBC Chapter 35. Amendments to the adopted building codes by <br /> the Washington Administrative Code (WAC) are incorporated into the referenced code citations. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.