Laserfiche WebLink
1 of 6 <br />Price Proposal: <br />Date: <br />Reference: <br />Sourcewell: <br />EMB Public Restroom, City of Everett, WA <br />June 20, 2023 <br />11543A-4/2/2023-4 <br />Contract # 081721-PRM <br />Our Offer to Sell: <br />Restroom Building and Shipping Cost @ $ 349,403 <br />Public Restroom Company (PRC) herein bids to furnish (building only per plans and <br />specifications, delivered to site with all costs except installation including applicable taxes <br />excluding retention. (Retention is not allowed as this is materials or a product fully assembled <br />before shipment to the site and therefore not subject to retention.) <br />Owner/General Contractor verification of site access to allow Building Delivery: <br />1.You certify to PRC that suitable delivery access to the proposed building site is available. Suitable <br />access is defined as 14’ minimum width, 16’ minimum height, and sufficient turning radius for a <br />crane and 70’ tractor-trailer. <br />2.Our cost is based upon the crane we provide being able to get within 35’ from the building <br />center and for the delivery truck to be no more than 35’ from the crane center picking point. <br />3.If the path to the building site traverses curbs, underground utilities, landscaping, sidewalks, or <br />other obstacles that could be damaged, it is the Owner/General Contractor ‘s responsibility for <br />repair and all costs, if damage occurs. <br />4.If trench plating is required, it shall be the cost responsibility of the Owner/General Contractor. <br />5.If unseen obstacles are present when site installation begins, it is the Owner/General Contractor <br />responsibility to properly mark them and verbally notify PRC before installation. <br />6.If weather becomes an issue for safety or site installation delays due to weather, <br />Owner/General Contractor or PRC with General Contractor’s confirmation may call-off set. If <br />building set is stopped, relocation of the building modules to an onsite or offsite location may <br />incur additional costs to Owner/General Contractor. <br />Installation Notice and Site Availability: <br />PRC will provide sufficient notice of delivery of the prefabricated building. The Owner/General <br />Contractor shall make the site available during the delivery period. During the delivery period, on an <br />improved site, Owner should stop site watering several days before delivery to minimize the impact on <br />the soils for the heavy equipment needed for installation. <br />Caution: If site is not ready for our field crew to perform their installation and if no notice of delay in <br />readiness from Owner/General Contractor is received, PRC will provide a change order for re- <br />mobilization on a daily basis until the site is ready for us. Ready means that the site pad is completed, <br />the corner required survey stakes are in place, the slab elevation stakes are in place, the location of <br />the front of the building is confirmed on site, and access to the site is available from an improved <br />roadway. Owner/General Contractor shall sign the change order before we will continue delivery. <br />EMB Public Restroom - City of Everett, WA| 6/20/2023| Reference # 11543A-4/2/2023-4 <br />2587 Business Parkway | Minden, NV 89423 | www.PublicRestroomCompany.com | p: 888-888-2060 | f: 888-888-1448